State: 30.06.2021 p. 2
Mounting instruction multiplay „angulus 2“
Item-No. 51 7522 601
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
1. Select the location of the play equipment taking into account the required
minimum space (see diagram 3).
2. Carry out excavation work for the foundations as shown in diagram 2. After
excavation compress the foundation floor.
Note:
The combination equipment is installed at play level. Pay attention to
items marked „play level” at play equipment!
3. Set up the concrete foundations according to diagram 2 with central, horizon-
tal reinforcement.
4. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and
the foundation hole with excavation.
5. Clean the surface of the foundations and start with the installation of the play
equipment.
6. Fix the post shoes to the post using the screws included in the delivery, do
not tighten yet! Pay attention to the parallel alignment of the wooden surface
and the stainless steel plate (see diagram 4c).
7. Place the hexagons as described in diagram 1 and 2 on the foundations and
align it.
Note: Do not screw the base plates onto the foundations yet.
8. Connect the climbing balls (see diagram 5a) and the parallel bars slide (see
diagram 5b) at the intended locations acc. to diagram 1 and 4b and fasten it
with the screws, washers and cap nuts included in the delivery.
Diagram 2: Foundation plan
Reinforcement plan:
Concrete foundation with reinforcement
Foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C20/25 – C25/30
2130
3421
450
1992
400
823
A
A
966
2132
716
3198
980
600
600
600
400
1300
800
400
600
980
1815
1640
1015
A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
angulus2
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:30
A3
Name
Name
Fundament
1021-00-00
Maßstab
Mattheis
22.03.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
ES
26.08.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
2130
3421
450
1992
400
823
A
A
966
2132
716
3198
980
600
600
600
400
1300
800
400
600
980
1815
1640
1015
A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
angulus2
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:30
A3
Name
Name
Fundament
1021-00-00
Maßstab
Mattheis
22.03.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
ES
26.08.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
2130
3421
450
1992
400
823
A
A
966
2132
716
3198
980
600
600
600
400
1300
800
400
600
980
1815
1640
1015
A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
angulus2
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:30
A3
Name
Name
Fundament
1021-00-00
Maßstab
Mattheis
22.03.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
ES
26.08.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
play level