Mounting instruction multiplay „angulus 2“

Item-No. 51 7522 601

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3). 

2.  Carry out excavation work for the foundations as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note:

The combination equipment is installed at play level. Pay attention to 

items marked „play level” at play equipment!

3.  Set up the concrete foundations according to diagram 2 with central, horizon-

tal reinforcement.

4.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

5.  Clean the surface of the foundations and start with the installation of the play 

equipment. 

6.  Fix the post shoes to the post using the screws included in the delivery, do 

not tighten yet! Pay attention to the parallel alignment of the wooden surface 
and the stainless steel plate (see diagram 4c).

7.  Place the hexagons as described in diagram 1 and 2 on the foundations and 

align it. 

Note: Do not screw the base plates onto the foundations yet.   

8.  Connect the climbing balls (see diagram 5a) and the parallel bars slide (see 

diagram 5b) at the intended locations acc. to diagram 1 and 4b and fasten it 
with the screws, washers and cap nuts included in the delivery.

Diagram 2: Foundation plan

Reinforcement plan: 

Concrete foundation with reinforcement

Foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C20/25 – C25/30

2130

3421

450

1992

 400 

 823 

A

A

966

2132

716

3198

980

600

600

600

400

1300

800

400

600

980

1815

1640

1015

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

angulus2

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:30

A3

Name

Name

Fundament

1021-00-00

Maßstab

Mattheis

22.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
ES

26.08.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

2130

3421

450

1992

 400 

 823 

A

A

966

2132

716

3198

980

600

600

600

400

1300

800

400

600

980

1815

1640

1015

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

angulus2

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:30

A3

Name

Name

Fundament

1021-00-00

Maßstab

Mattheis

22.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
ES

26.08.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

2130

3421

450

1992

 400 

 823 

A

A

966

2132

716

3198

980

600

600

600

400

1300

800

400

600

980

1815

1640

1015

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

angulus2

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:30

A3

Name

Name

Fundament

1021-00-00

Maßstab

Mattheis

22.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
ES

26.08.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

play level

Summary of Contents for angulus 2

Page 1: ... Item No 51 7522 601 stilum GmbH Gewerbegebiet Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved parallel bars slide hexagons Diagram 1 Overall view of the play equipment climbing balls post climbing net post shoe ...

Page 2: ...inforcement Foundation BSt 500S Stirrups Ø 8 mm lengthwise and cross Concrete cover h 3 cm Concrete quality class C20 25 C25 30 2130 3421 450 1992 400 823 A A 966 2132 716 3198 980 600 600 600 400 1300 800 400 600 980 1815 1640 1015 A A OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NO...

Page 3: ...plates are covered with appropriate fall protection 13 Do not allow children to use the equipment before the installation has been finished Attention If the play equipment has been incompletely installed or partly dis mantled when carrying out maintenance and repair work this may lead to par ticular risks of injury for the user For this reason make clearly visible that the equipment shall not be u...

Page 4: ...VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER WENDET WERDEN ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT Oberflächen nach DIN ISO 1302 Reihe 2 Zul Abweichung DIN 2768 mH 1 angulus Kletterbogen Benennung Gepr Werkstoff Blatt Datum Projekt Gez Zuschnitt Zeichnungsnummer Rev Änderung Datum 1 10 A3 Gewicht Name Name Kletterbogen...

Page 5: ...ng soiling it is appropriate to clean the playground equipment at intervals of three to six months WOOD NOTE For all play equipment with wooden elements it cannot be ruled out that dry cracks may develop These natural changes of wood are dependent on climate conditions as well as on the age and usage of the play equipment Longer dry periods may lead to more dry cracks This development however does...

Reviews: