2
Double-wide Shelves 3-tier
Things to know
Step 1
2
3
5
4
6
Shelves should be removed
from the frames prior to
assembly. Once assembly is
finished, unwrap and place the
shelves back into the frames.
Remove the shelves
Make sure there are no gaps
after connecting the poles
and frames. Use as much force
as needed with the included
mallet to eliminate any gaps.
Watch out for gaps
Check the feet
Use the mallet included with
your order to avoid damaging
the poles and frames. Shelves
are installed by hand and do
not require the use of a mallet.
Use the right tool
Leveling feet should remain all
the way in during assembly to
avoid damaging the feet. Once
assembly is finished, adjust the
leveling feet as needed.
Summary of Contents for Double-wide Shelves 3-tier
Page 1: ...Double wide Shelves 3 tier ...
Page 2: ......
Page 6: ...4 Double wide Shelves 3 tier Step 1 Place the bottom frame on a level surface ...
Page 7: ...5 Double wide Shelves 3 tier Step 2 Install poles ...
Page 8: ...6 Double wide Shelves 3 tier Install middle frame Step 3 ...
Page 9: ...7 Double wide Shelves 3 tier Step 4 Install poles ...
Page 10: ...8 Double wide Shelves 3 tier Step 5 Install top frame ...
Page 11: ...9 Double wide Shelves 3 tier Step 6 Install shelves ...
Page 15: ......