If no floor option was purchased, go to step 2.0 (Wall Assembly)
STEP 1.0
FLOOR KIT
1.0
–
FLOOR KIT
PART CODE QTY
DESCRIPTION
EP
4
End Plate 2470mm
SJ
8
Single Joist 2330mm
DJ
4
Double Joist 2330mm (42x35mm part of DJ goes at the top inside)
FN
12
Floor Nog
100BS
56
100mm Batten screw (Heavy Duty Floor Only)
75N
56
75mm Nail (Rebated Floor Only)
65HHS
28
65mm Hex Head Screw
1.0
–
FLOOR FRAME
Fasten through EP into DJ using 3 x 100BS per join (75N on Rebated Floor)
Fasten through EP into SJ using 2 x 100BS per join (75N on Rebated Floor)
Fasten FN’s in positions shown below using 65HHS
Fasten floor frames together using 6 x 65HHS
HEAVY DUTY FLOOR KIT
The 16X8 Heavy Duty floor frame comes in two parts. Install one floor frame in desired position at desired
height, and ensure fully supported in all 4 corners. Butt second floor frame and attach to installed frame using
6 x 65HHS evenly spaced along EP. Ensure other end is level and supported.
Heavy duty floor can be installed on unlevelled ground
–
use supplied logs to level your floor by digging them
into the ground- see support positions in pic above
–
attach logs to floor using 4 x 100BS per support.
Yellow Tongue
DJ
DJ
SJ
SJ
SJ
SJ