32 |
P a g e
STEP 5.6
PAD BOLT INSALLATION
5.6 - ASSEMBLY PARTS
–
PAD BOLT INSTALLATION
PART CODE
QTY
DESCRIPTION
PB
2
Pad bolt
HS
8
Hinge Screw
5.6 - ASSEMBLY
–
PAD BOLT INSTALLATION
Hold PB in position and fasten to door. Mark centre of bolt and drill 12mm hole in marked
closed position. Repeat for bottom pad bolt.
-
The T handle must be installed on the opposite door to the pad bolted door (fixed
door)
STEP 5.7
DOOR HANDLE ASSEMBLY
5.7 - ASSEMBLY PARTS
–
DOOR HANDLE ASSEMBLY
PART CODE QTY
DESCRIPTION
TH
1
T Handle
5.7 - ASSEMBLY
–
DOOR HANDLE ASSEMBLY
Mark and drill 12mm centre hole in position shown, 50mm in from door edge. T Handle
must be installed centre of the centre door brace (on the back)
Insert T handle in position and mark two outside holes. Remove T handle and drill 2 x 6mm
holes.
Insert T handle back in with bolts, and fasten nuts on back of door.
Summary of Contents for Hazel 9x6
Page 43: ...42 P a g e ...
Page 46: ...45 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Page 47: ...46 P a g e ...
Page 48: ...47 P a g e ...
Page 49: ...48 P a g e ...
Page 50: ...49 P a g e ...
Page 51: ...50 P a g e ...
Page 52: ...51 P a g e ...
Page 53: ...52 P a g e ...
Page 54: ...53 P a g e ...