4 |
P a g e
If no floor option was purchased, go to step 2.0 (Wall Assembly)
STEP 1.0
FLOOR KIT
1.0
–
FLOOR KIT
PART CODE QTY
DESCRIPTION
EP
2
End Plate 2470mm
SJ
4
Single Joist 2330mm
DJ
2
Double Joist 2330mm (42x35mm part of DJ goes at the top inside)
FN
6
Floor Nog
100BS
28
100mm Batten screw (Heavy Duty Floor Only)
75N
28
75mm Nail (Rebated Floor Only)
65HHS
12
65mm Hex Head Screw
1.0
–
FLOOR FRAME
Fasten through EP into DJ using 3 x 100BS per join (75N on Rebated Floor)
Fasten through EP into SJ using 2 x 100BS per join (75N on Rebated Floor)
Fasten FN’s in positions shown below using 65HHS
Yellow Tongue