
35
MS 311, MS 391
:
Fit the screws (arrows).
:
Tighten down the screws
(arrows) in an alternate pattern.
– Reassemble all other parts in the
reverse sequence.
6.6
Bearings / Crankshaft
– Remove the cylinder,
– Remove the crankshaft and pull
off the oil seals,
– Remove the piston,
:
Pull the ball bearing (1) off the
tapered crankshaft stub.
4903RA072 TG
1
4903RA082 TG
:
Pull the ball bearing (1) off the
straight crankshaft stub.
:
The crankshaft (1), connecting
rod (2) and needle bearing form
an inseparable unit.
When fitting a replacement
crankshaft, always install new ball
bearings and oil seals.
Before installing, clean the
crankshaft,
Heated ball bearings must be
installed quickly because the
crankshaft stubs absorb heat and
expand.
1
4903RA083 TG
4903RA084 TG
2
1
– Heat the bearing inner race to
about 150°C (300°F).
:
Push the ball bearing onto the
straight crankshaft stub as far as
stop.
– Heat the bearing inner race to
about 150°C (300°F).
:
Push the ball bearing onto the
tapered crankshaft stub as far as
stop.
– Lubricate the needle bearing with
oil.
– Install the piston,
– Install the crankshaft and oil
seals,
1
4903RA085 TG
1
4903RA086 TG
Summary of Contents for MS 311
Page 1: ...STIH STIHL MS 311 391 2009 06 ...
Page 92: ...91 MS 311 MS 391 ...
Page 93: ...92 MS 311 MS 391 ...
Page 94: ...englisch english 0455 542 0123 M2 2 K09 FST Printed in Germany ...