
32
| PSH Universal EL www.stiebel-eltron.com
Installation
Commissioning
11. Commissioning
11.1 Commissioning
f
f
Open the shut-off valve in the cold water line.
f
f
Open a draw-off point until the appliance has filled up and
the pipework is free of air.
f
f
Observe the maximum permissible flow rate with a fully
opened tap (see chapter "Specification / Data table").
f
f
Switch the mains power ON. The appliance carries out a
self-test.
f
f
Check the function of the appliance.
f
f
Check the function of the safety valve.
11.1.1 Appliance handover
f
f
Explain the appliance function to users and familiarise them
with its operation.
f
f
Show the user the safety valve and its operating instructions,
and explain its significance.
f
f
Make the user aware of potential dangers, especially the risk
of scalding.
f
f
Hand over these instructions.
11.2 Returning into use
See chapter "Commissioning".
12. Settings
12.1 Switching on commercial mode
26
�0
2�
07
�0
29
6
S Jumper ECO (energy saving mode)
E ECO ON (factory setting)
A ECO OFF (commercial mode)
f
f
To switch on commercial mode, replug the jumper.
12.2 Switching on reverse control
26
�0
2�
07
�0
29
6
R Reverse control jumper
E Reverse control ON
A Reverse control OFF (factory setting)
f
f
To switch on reverse control, replug the jumper.
13. Taking the appliance out of use
f
f
Disconnect the appliance from the mains at the MCB/fuse in
the fuse box.
f
f
Drain the appliance. See chapter "Maintenance / Draining the
appliance".