EN
GL
ISH
4
| ACCELERA® 300 HEAT PUMP WATER HEATER
WWW.STIEBEL-ELTRON-USA.COM
QUICK START-UP GUIDE | OPERATION
H
M
C
Cold water
Hot water
2
12
15
13
14
11
3
4
5 6
7
8
9
10
1
1
Vacuum breaker
2
Hot water connection (Union adaptor to 3/4")
3
Mixing valve (optional, supplied by installer)
4
Connection for T&P valve ¾"
5
T&P valve ¾", 0.69 MPa @99 °C (100 psi @210 °F) (supplied with unit)
6
0.551 MPa (80 psi) relief valve (optional, supplied by installer)
7
Expansion tank (optional, supplied by installer)
8
Straight-through shut-off valve (supplied by installer)
9
Check valve (optional, supplied by installer)
10 0.48 MPa (70 psi) pressure reduction valve (optional, supplied by installer)
11 Cold water connection (with Union adaptor to 3/4")
12 Condensate drain (elbow supplied with unit)
13 Drain valve (supplied by installer)
14 Drain pan (supplied by installer)
15 Condensate spillover