www.stiebel-eltron.com
SHW S |
29
EN
GL
ISH
INSTALLATION
Specification
Dual circuit operation, single meter measurement with power
supply utility contact
In the following connection examples, the rapid heating output
during peak tariff periods is given after the forward slash.
Note the position of the circuit breaker in the control panel.
2/4 kW
Switch position I
1/N/PE ~ 230 V
4/4 kW
Switch position Il
1/N/PE ~ 230 V
2
1
26
�0
2�
79
�0
06
1
2/6 kW
Switch position I
3/N/PE ~ 400 V
2
1
26
�02
�7
9�
00
62
3/6 kW
Switch position I
3/N/PE ~ 400 V
2
1
26
�0
2�
79
�0
06
3
4/6 kW
Switch position I
3/N/PE ~ 400 V
6/6 kW
Switch position Il
3/N/PE ~ 400 V
2
1
26
�0
2�
79
�0
06
4
1 Pushbutton for rapid heating
2 Power supply utility contact
Single circuit operation
In the following connection examples, the output of the rapid
heater is given in brackets.
Note the position of the circuit breaker in the control panel.
2(4) kW
Switch position I
1/N/PE ~ 230 V
4(4) kW
Switch position Il
1/N/PE ~ 230 V
26
�0
2�
79
�0
06
5
2(6) kW
Switch position I
3/N/PE ~ 400 V
26
�0
2�
79
�0
06
6
3(6) kW
Switch position I
3/N/PE ~ 400 V
26
�0
2�
79
�0
067
4(6) kW
Switch position I
3/N/PE ~ 400 V
6(6) kW
Switch position Il
3/N/PE ~ 400 V
26
�0
2�
79
�0
06
8