1. Connect the Pump to the water hose that exits from the bottom of
the Cascading Waterfall Top section as shown above in
STEP 1
of
Fig. 1
.
2. Place Waterfall Top on Fountain Base and place pump in slot.
3. Insert Wild Bird Wading Deck into Cobblestone Water Reservoir Basin
as shown in
INSET
above. (if desired)
4. Decide on a suitable location to place your Cobblestone Cascade.
5. Fill Cobblestone Water Reservoir Basin with clean water.
6. Connect Pump to 110V outlet. Ensure that the electric plug is connected
to an approved power supply and is located in a weatherproof environment.
(If in any doubt, it is recommended you consult a qualified electrician)
Do not switch power on until the basin has been filled with water.
7. Once steps 1-6 above are complete, you can adjust the water flow
by adjusting the water flow up “+” or down “-” by the water flow lever
found on the front of your pump in
Fig. 2.
Fig. 2
Wild Bird Wading Deck
Cascading Waterfall Top
Cobblestone Water
Reservoir Basin
Pump
with
Electric
Cable
SP-130 Pump
Flow Control
Fig. 1
Section 2: Assembly Instructions
INSET
STEP 1