background image

1. Connect the Pump to the water hose that exits from the bottom of 

the Cascading Waterfall Top section as shown above in 

STEP 1 

of

 Fig. 1

.

2. Place Waterfall Top on Fountain Base and place pump in slot.

3. Insert Wild Bird Wading Deck into Cobblestone Water Reservoir Basin

as shown in 

INSET

 above. (if desired)

4. Decide on a suitable location to place your Cobblestone Cascade.

5. Fill Cobblestone Water Reservoir Basin with clean water.

6. Connect Pump to 110V outlet. Ensure that the electric plug is connected 

to an approved power supply and is located in a weatherproof environment.

(If in any doubt, it is recommended you consult a qualified electrician)

Do not switch power on until the basin has been filled with water.

7. Once steps 1-6 above are complete, you can adjust the water flow 

by adjusting the water flow up “+” or down “-” by the water flow lever 

found on the front of your pump in 

Fig. 2.

Fig. 2

Wild Bird Wading Deck

Cascading Waterfall Top

Cobblestone Water 

Reservoir Basin

Pump 

with

Electric 

Cable

SP-130 Pump

Flow Control

Fig. 1

Section 2:  Assembly Instructions

INSET

STEP 1

Reviews: