Installation, Operation and Maintenance Manual – FMA 3000
Ref: 3000/T/6/VH
23
11. – PREVENTIVE MAINTENANCE SCHEDULE
MAINTENANCE
FREQUENCY
ITEM
ACTION
EXTERNAL
Check operation
6 months
Entire filter
Manual cleaning cycle.
Check:
Hydraulic piston drainage.
Open valve.
Effective cleaning cycle (achieve P
1
= P
2
)
Anticorrosion
treatment
12 months
FMA housing
(item 2)
Review anticorrosion treatment on required points.
Apply Epoxy – Polyester treatment
Piston
6 months
Piston
(item 2)
Remove hydraulic piston.
Remove scale deposits from the stem.
Pressure line
1 week
Intake filter
(item 20)
Clean the intake filter and microtubes which bring water
to flush valve.
INTERNAL
Anticorrosion
treatment
12 months
FMA housing
(item 2)
Review anticorrosion treatment on required points.
Apply Epoxy – Polyester treatment
Suction nozzles
12 months
Suction nozzle
(item 15.13)
Check the condition of suction nozzles, bristles, proximity
to the cartridge.
Filtering cartridge
Periods of inactivity
Filtering cartridge
(item 14.1)
Perform a manual cleaning using water under pressure.
Use acid or other chemicals if necessary.
Gaskets
12 months
Internal gaskets
Item 6
Item 13
Item 20.5
Item 20.8
Item 20.9
Check internal gaskets, replace if damaged.
Summary of Contents for FMA-3000
Page 5: ...Installation Operation and Maintenance Manual FMA 3000 Ref 3000 T 6 VH 5 ...
Page 7: ...Installation Operation and Maintenance Manual FMA 3000 Ref 3000 T 6 VH 7 2 WARRANTY ...
Page 17: ...Installation Operation and Maintenance Manual FMA 3000 Ref 3000 T 6 VH 17 ...
Page 38: ...Installation Operation and Maintenance Manual FMA 3000 Ref 3000 T 6 VH 38 ...
Page 39: ...Installation Operation and Maintenance Manual FMA 3000 Ref 3000 T 6 VH 39 ...