Sterilight Silver S12Q-PA Owner'S Manual Download Page 4

1

P

ARTS

:

OR-212

aluminum gland nut

RN-001

Hard glass, coated

Sterilume

®

-EX UV lamps

for long, consistent life 

(9000 hours)

S212RL

FOR SQ-PA 

S287RL

FOR S1Q-PA & SSM-14

S330RL

FOR S2Q-PA & SSM-17

S463RL

FOR S5Q-PA & SSM-24

S810RL

FOR S8Q-PA & SSM-37

S36RL

FOR S12Q-PA & SSM-39

Open-ended, 214 fused

quartz sleeves with fire 

polished ends

QS-212

FOR SQ-PA

QS-001

FOR S1Q-PA & SSM-14

QS-330

FOR S2Q-PA & SSM-17

QS-463

FOR S5Q-PA & SSM-24

QS-810

FOR S8Q-PA & SSM-37

QS-012

FOR S12Q-PA & SSM-39

Controller

POWER - 100-240V./50-60Hz. 

BA-ICE-S

SILVER “BASIC” SYSTEM

BA-ICE-SM

SILVER “PLUS” SYSTEM

IEC replacement power cords for 

Silver

ICE Controller (sold separately)

260010

NORTH AMERICAN (NEMA 5-15P), 
3-PRONG GROUNDED

260011

CONTINENTAL EUROPEAN (CEE 7/7), 
2 PIN WITH GROUND , “SCHUKO”

260012

UK VERSION (BS 1363),
3 PRONG GROUNDED (5 AMP FUSE)

260013

AUSTRALIAN VERSION (AS 3112),
3 PRONG GROUNDED

260019

NO CONNECTOR,
3 WIRE, BARE LEADS

304 stainless steel reactors with 

600 grit polish 

(A249 pressure rated tube)

retaining

clip

lamp connector

o-ring 

UV sensor

optional flow

restrictors

Note: drain plug

on S12Q-PA &

SSM-39 only

254NM-S1

FOR SSM-14, SSM-17,
SSM-24 & SSM-37

254NM-S2 FOR SSM-39

Summary of Contents for Silver S12Q-PA

Page 1: ...24 SSM 37 SSM 39 Installation Operation and Maintenance Manufactured in Canada by P N 520104 EPA 57987 CN 001 September 2005 425 Clair Road West P O Box 1719 Guelph ON N1L 1R1 Canada t 519 763 1032 f 519 763 5069 e water r can com i www r can com Owner s Manual ...

Page 2: ...ce you have taken the first step in ensuring the safety of your water supply by using a totally non intrusive physical disinfection method Your Sterilight system uses the most advanced UV technology on the market and is designed to provide you with years of trouble free operation with minimal maintenance required ...

Page 3: ...hematic Breakdown 1 Safety Instructions 2 Water Chemistry 3 Installing Your UV Disinfection System 3 5 Disinfection Procedure 6 7 Operating Maintenance Instructions 7 9 Operation 10 13 Troubleshooting 14 15 Silver Series Dose Flow Chart 15 Specifications 16 17 Manufacturer s Warranty 18 SYMBOLS ...

Page 4: ...Controller POWER 100 240V 50 60Hz BA ICE S SILVER BASIC SYSTEM BA ICE SM SILVER PLUS SYSTEM IEC replacement power cords for Silver ICE Controller sold separately 260010 NORTH AMERICAN NEMA 5 15P 3 PRONG GROUNDED 260011 CONTINENTAL EUROPEAN CEE 7 7 2 PIN WITH GROUND SCHUKO 260012 UK VERSION BS 1363 3 PRONG GROUNDED 5 AMP FUSE 260013 AUSTRALIAN VERSION AS 3112 3 PRONG GROUNDED 260019 NO CONNECTOR 3 ...

Page 5: ...ts not recommended or sold by the manufacturer distributor may cause an unsafe condition 8 Intended for indoor use only Do not install this disinfection system where it will be exposed to the weather or to temperatures below freezing Do not store this disinfection system where it will be exposed to the weather Do not store this disinfection system where it will be exposed to temperatures below fre...

Page 6: ...ted to the stainless steel reactor chamber The disinfection system is designed to be mounted either horizontally or vertically at the point of use or point of entry depending on the specific flow rate of the unit Note The ideal installation is vertical with the lamp connector on top This is to prevent water damage from occurring on the lamp pins and lamp connector The ballast should be mounted eit...

Page 7: ...outlined on page 6 of this document If the water is to be consumed while the system is off line the water must be boiled for twenty minutes prior to consumption 2 Select a suitable location for the disinfection system and its related components As it is recommended to install a ground fault protected circuit GFCI make sure that this is taken into consideration prior to any installation The system ...

Page 8: ...ain to prevent any water from potentially entering the controller Affix the green ground wire to the grounding lug at the top of the reactor vessel and securely fasten with the lugnut provided Figure 1E 5 Install the UV lamp and UV sensor as outlined on pages 7 9 6 Install the over molded lamp connector as outlined on page 7 7 When all plumbing connections are made slowly turn on the water supply ...

Page 9: ...d the chlorine disinfection solution you will need to leave the solution sit for a period of 20 30 minutes Reinstall the pre filter cartridge into the filter and then flush the chlorine solution from the system Make sure that each fixture that was disinfected in step two is completely flushed of the chlorine solution as the consumption of this water is not advised due to the extremely high concent...

Page 10: ...n closing a seasonal home or leaving the unit in an area subject to freezing temperatures OPERATING MAINTENANCE INSTRUCTIONS Caution PRIOR TO PERFORMING ANY WORK ON THE DISINFECTION SYSTEM ALWAYS DISCONNECT THE POWER SUPPLY FIRST UV Lamp Replacement Cleaning 1 To replace the lamp there is NO need to disconnect the system from the water supply nor to drain the water from the reactor chamber Lamp re...

Page 11: ... step 1 4 then perform the following steps a Shut off water supply and drain all lines b Remove the lowest connection on the disinfection system and drain the UV chamber use a small bucket under the unit to prevent a spill Note On S12Q PA SSM 39 systems the reactor is provided with a 1 4 drain port On this system simply remove drain plug and allow water to drain into a bucket c Remove aluminum gla...

Page 12: ...e 4C until the sensor is free of the threaded sensor port 3 Once the sensor is free from the reactor chamber clean the quartz window with a commercial scale remover CLR or Lime A Way and a lint free cotton swab Figure 4D Follow all manufacturer s instructions regarding the cleaning fluid used Do not use an abrasive cleaner on the sensor window Scratching of the sensor window will void any manufact...

Page 13: ...p connector 4 replace lamp connector 5 hold down the RESET switch while reapplying power to the controller 6 5 second delay will occur until you hear an audible tone LED display will read once again Once you hear the tone let go of the switch and the counter will be reset The delay switch is designed to allow you time to address the alarm while you obtain a new UV lamp Even though the alarm on the...

Page 14: ... the UV level is this low to Indicates the UV level is nearing the point of unsafe UV intensity at this level the system should be CLOSELY examined to determine why the UV level is this low to Indicates the UV level has now reached a level that is unsafe At this level the water should not be consumed The system water supply should be examined to determine the reason for the low UV level of the UV ...

Page 15: ...V level rises above 49 at which time the solenoid will open allowing for water to pass through To temporarily defer the operation of this solenoid output for up to 12 hours please refer to the instructions outlined on page 11 of this manual NOTE DURING BYPASS THE DO NOT CONSUME THE WATER tag included with this manual should be placed in a prominent location and the water should NOT be consumed unt...

Page 16: ...ble comes with 20 meters 65 of cable for the 4 20 mA signal To install first remove the existing sensor cable from the Silver Plus controller Figure 5B and affix the new Y cable Figure 5C Next attach the male end of the existing sensor cable to the female end of the new Y cable Appropriately attach the 4 20 mA cable to the applicable equipment and ensure all connections are hand tight FIGURE 5A FI...

Page 17: ...d by UV system Heated Product Water common problem caused by infrequent use of water run water until it return to ambient temperature Water Appears Milky caused by air in the water lines run water until air is purged Unit Leaking Water problem with o ring seal on gland nut and or UV sensor ensure o ring is in place check for cuts or abrasions clean o ring moisten with water and re install replace ...

Page 18: ...o power lamp check to see if there is sufficient power to the UV system Low UV level displayed on screen test water supply to see if water quality meets recommended parameter limits clean quartz sleeve and sensor eye LED flashing A2 and then back to UV level low UV alarm deferral has been activated UV level has dropped below 50 and the audible alarm has been muted by pressing the reset switch and ...

Page 19: ...MNPT Shipping Weight 2 3 kg 5 lbs 2 3 kg 5 lbs 2 7 kg 6 lbs 3 2 kg 7 lbs 4 5 kg 10 lbs 5 4 kg 12 lbs Electrical Voltage2 100 240V 50 60Hz2 100 240V 50 60Hz2 100 240V 50 60Hz2 100 240V 50 60Hz2 100 240V 50 60Hz 100 240V 50 60Hz Power Consumption 15 W 19 W 22 W 30 W 46 W 48 W Lamp Watts 10 W 14 W 17 W 25 W 37 W 39 W Maximum Operating Pressure 8 62 bar 125 psi 8 62 bar 125 psi 8 62 bar 125 psi 8 62 b...

Page 20: ... 2 kg 7 lbs 3 6 kg 8 lbs 5 0 kg 11 lbs 5 9 kg 13 lbs Electrical Voltage 100 240V 50 60Hz 100 240V 50 60Hz 100 240V 50 60Hz 100 240V 50 60Hz 100 240V 50 60Hz Power Consumption 19 W 22 W 30 W 46 W 48 W Lamp Watts 14 W 17 W 25 W 37 W 39 W Maximum Operating Pressure 8 62 bar 125 psi 8 62 bar 125 psi 8 62 bar 125 psi 8 62 bar 125 psi 8 62 bar 125 psi Ambient Water Temperature 2 40 C 36 104 F 2 40 C 36 ...

Page 21: ...nce 75 call factory for recommendations on applications where UVT 75 Where total hardness is less than 7 gpg the UV unit should operate efficiently provided the quartz sleeve is cleaned periodically If total hardness is over 7 gpg the water should be softened Warranty will be void if the proper steps are not taken to ensure that these impurities are not present 2 This limited Warranty shall not ap...

Page 22: ... Public B Community Well C Your Own Well D Lake River E Cistern F Other specify ______________ 7 Do you have any other water treatment products specify __________________________________________________________________________________________ 8 Who installed your unit A Yourself B Plumber C Other 9 Unit purchase price __________ Installation cost __________ 10 Do you have or use bottled water A Ye...

Page 23: ...amp Here DO NOT CONSUME THE WATER The system has been placed on by pass and as a result the water in this distribution system should not be consumed until the system has been fully sanitized and returned to service Please refer to the Installation Manual for complete disinfection procedure ...

Reviews: