16
7.3 Control
7.4 Close file
7.5 Log file
It allows to make the following tests on the
UPS:
• Test the UPS for 10 sec.
• Test the UPS for several minutes.
• Test the UPS until that battery is low.
• Cancel UPS test.
• Turn on / off alert tone.
• Shut down the system.
In this section, you can check the closed applications and saved files.
Here you can view the events and the team’s data:
•
Data log:
Data from the UPS, such as the input and output voltage, line
frequency, load, battery capacity and temperature, etc., will be recorded in
this section.
Summary of Contents for NB-1010
Page 1: ......
Page 12: ...12 3 2 1 7 Funciones Después de acceder al software aparece un cuadro de función ...
Page 20: ...20 ...
Page 21: ......
Page 32: ...12 3 2 1 7 Functions After accessing the software a function box appears ...
Page 40: ......