Support:
steppir.com/support
⚫
Tel: 425.453.1910
⚫
Page 39
SECTION 4.6
ATTACH THE ELEMENTS TO THE EHUs (continued)
SECURING THE ELEMENTS TO THE EHU
When the CPVC inner guide tubes are completed, they will need to be inserted into the telescoping
poles and secured to the Driven EHU.
Figure 4.60
below gives an overview of this procedure, with de-
tailed instructions following on the next page.
This drawing shows the EHU placement for the Driven element, the procedure is the same for the Di-
rector element,
except the Director does NOT have the guide tubes
. The parts required for the
Driven EHU Assembly are shown in the table below.
Key
QTY
Part #
Description
A
2
10
-
1006
-
22
Quick disconnect boot
B
2
10
-
1013
-
02
Telescoping pole
C
2
NA
Inner guide tube assembly consisting of diverter cone ,
39
-
7/8”
and
49”
CPVC Plastic tube, glued together.
(NOT USED FOR THE DIRECTOR)
A
A
B
B
C
C
Molded ring prevents the
pole from sliding out from
under the quick disconnect
boots —
even in very high
winds.
FIG. 4.60
Driven EHU
Quick disconnect
boot