Support:
steppir.com/support
⚫
Tel: 425.453.1910
⚫
Page 31
Preliminary WIRING AND MECHANICAL EHU Testing
Refer to the SDA100 manual for conducting the preliminary testing for the EHUs
NOTE
: The wiring test is done to ensure that the wiring of the EHUs is done cor-
rectly. It is critical that the wiring be as shown in
Figure 3.11
. Incorrect wiring
can potentially damage the antenna or antenna controller, in addition to causing
poor performance.
Once all of the EHUs are correctly wired and each EHU is being properly con-
trolled by the SDA100, the initial testing is completed.
PREPARING THE BOOM ASSEMBLY
WIRING EHUS TO CONTROL CABLE
SECTION 3.1
Driven
EHU
Director
EHU
Black
Red
Green
White
Black
Red
Green
White
Male
25
-
pin
D
-
sub
Black
Brown
Red
Orange
Yellow
Green
Blue
Violet
White
Pink
Cream
Grey
1
2
3
4
5
6
7
8
10
11
12
9
Drain Wires
from each
element
Terminal Block 1
Terminal Block 2
Ante
nn
a Co
nt
rolle
r
Shield (drain wire)
12
conductor
cable
Figure 3.11
Figure 3.10
not used