8
SLIP
SCOOP
INSTALLATION/OPERATION
HYDRAULIC SLIP SCOOP OPERATION
1. Use “Low” (1) range for operating scoop.
2. Level the scoop, for loading materials, by moving the auxiliary hydraulic lever. To dig into the surface, the
front edge of the scoop must be lower than the rear.
3. When the scoop is loaded, move the auxiliary hydraulic lever to roll back the scoop to contain the load.
4. To dump the load, move the auxiliary hydraulic lever.
NOTE:
A rear weight bar is recommended to use with the Slip Scoop. Add weights equal to the load carried
in the scoop. Remove weights when the Slip Scoop is removed.
HINTS FOR OPERATION OF HYDRAULIC SLIP SCOOP
A. Use “FLOAT” position for loading loose materials on a firm surface.
B. Use DOWN PRESSURE to dig into firm surfaces.
C. To level loose materials, roll the bucket to the extreme dump position. Lower the scoop and move
backward to get a back blade leveling effect. Use a little down pressure.
HYDRAULIC SLIP SCOOP INSTALLATION
1. Attach the slip scoop to the front lift.
2. Attach the hydraulic hoses to the auxillary couplers. Route the hoses in a place where they will not be
damaged. If the hydraulic lever movement seems backward, reverse the hoses at the quick couplers..