STEIN PROJECT Installation Instructions Manual Download Page 6

6

Top of Hinge Panel

is 10mm shorter 

at top than bottom

Glass Positioning Indicators

1.  Arrow shows top of glass panels.
2.  Hinge panel cut-out as Diagram F. 

3.  All glass profiles are 4mm below the 

bottom glass edge as Diagram E.

DIAGRAM F

Check you have glass panels up the right way (refer Diagram F). 

The specifications for glass vertical 

aluminium profile is 4mm below the glass.

Standard packing under the glass is 2mm but analyse your requirements.
Height 

Adjustment 

at 

wall 

          

To reduce height from 2mm packing also needs trimming the bottom of vertical profile this amount 

(Standard past glass is 4mm). Packing above 2mm will make an equal gap under this profile

Height 

Adjustment 

adjacent 

to 

door 

         

A reduction from 2mm will require the door to be raised to keep 14mm clearance for Seal/Waterbar.

INSTALLATION    

FIXED GLASS PANEL FITTING DETAILING

Fixed Glass & Floor Channel Layout

Leading Glass Edge

Fixed Glass

Profile

Bottom of Glass

Floor Channel

Depth 14.5mm

2mm Standard

Glass Packer

4mm

Profile extends 4mm 
below glass edge

DIAGRAM E

Summary of Contents for PROJECT

Page 1: ...ive your Project Shower package please check for any freight damage 2 If damage has occurred advise your supplier within 8 hours 3 Do not install any faulty product as this will invalidate later claim...

Page 2: ...centre off outside of the Acrylic tray 2 Plumbing fittings in the wall need suitable solid fixings 3 All Plumbing must be completed by a registered plumber and be in place prior to being lined 4 The...

Page 3: ...ith 3M Tape PAR1215 2 5 Door Seal PAR1210 1 14 Support Panel PAR1216 1 6 Handle Set PAR1211 1 15 Screws M4x8 PAR1036 8 7 Door Panel 1 16 Screw Cover Caps PAR1036 8 8 Buffer Seal PAR1212 1 17 Hinge Pan...

Page 4: ...m standard option using vertical seals either side of the door The door gaps will be 4mm wider than standard version Start at the outset if applying this option Go to appendage page 10 to get all the...

Page 5: ...or Channel DIAGRAM C Packing to level up glass panels is important step and the initial set up is based on 2mm packers Variation in packing will be needed Refer to next page for essential detailing in...

Page 6: ...but analyse your requirements Height Adjustment at wall To reduce height from 2mm packing also needs trimming the bottom of vertical profile this amount Standard past glass is 4mm Packing above 2mm w...

Page 7: ...ng edges and check door gap is 606mm max DIAGRAM G WALL CHANNEL FLOOR CHANNEL Apply silicone on the Wall Channel leading edge both sides Apply silicone on the inside of the Floor Channel on the leadin...

Page 8: ...back for door clearance 3 Ensure these are tight and adjusted to door opening measurement 1 Fit hinges to the hinge panel glass 17 Diagram J1 2 Fit handle 6 to door Diagram J2 3 Install the door 7 in...

Page 9: ...ERNAL JOINTS 1 Silicone seal boundary joints as indicated including detailing of corners SCREENS THAT ARE SEALED ON THE INSIDE WILL VOID WARRANTY UNLESS INDICATED OTHERWISE IN THIS MANUAL DIAGRAM K CO...

Page 10: ...PAGE 4 6MM REQUIRES FINAL ADJUSTMENT 6 5MM GAP VERTICAL SEAL ADJUST TOP SUPPORT GLASS BRACKET TO ACT AS A DOORSTOP DIAGRAM 2 DETAILING OF SEAL AND SUPPORT GLASS BRACKET POSITION A Hinge Gap 3 5mm B D...

Reviews: