®
UP/DOWN SWITCH
DOWN (5 SEC)
UP (1X)
DOWN (1X)
Initializing the Lifting Column
NOTICE:
Before installing the monitor onto the lifting column you must
“Initialize” the column to pre-set it to it’s at rest height. Failing to complete this
task may affect the mounting of the cabinet top.
1.
Check that all electrical cable connections are complete, and that all
cable routing is organized, secured and will not interfere with lift
operation. (See pages 7 and 9).
2.
With all electrical cables and connections secure, connect the lifting
3.
Start up/down with the lid CLOSED.
column to a power source.
4.
Press and hold the “DOWN” button for a full 5 seconds and observe
the column to ensure the ram jogs up and down slightly. If you do
not hear or see any movement, release the button and repeat this
step until a slight jog movement is observed.
5.
After successfully completing step 2, press the “UP” button on the
up/down switch to extend the lift column to it’s full extension.
6.
Press and release the “DOWN” button to fully retract the lift column
to it’s at rest height.
15 of 78
P/N 1094808001
Doc # 94775 Rev
F
4
5
6
Summary of Contents for Verb Active Media Table
Page 8: ...Leveling Cabinet Shim 1 1 8 of 78 P N 1094808001 Doc 94775 Rev F...
Page 9: ...2 3 Connecting Table to Cabinet 875 22 2mm x18 1 9 of 78 P N 1094808001 Doc 94775 Rev F...
Page 16: ...16 of 78 P N 1094808001 Doc 94775 Rev F 0 472 12 0 mm M6 x2...
Page 34: ...34 of 78 P N 1094808001 Doc 94775 Rev F Armoire de mise niveau Cale 1 1...
Page 35: ...35 of 78 P N 1094808001 Doc 94775 Rev F 2 3 Connexion de la table l armoire 875 22 2mm x18 1...
Page 42: ...42 of 78 P N 1094808001 Doc 94775 Rev F 0 472 12 0 mm M6 x2...
Page 60: ...60 of 78 P N 1094808001 Doc 94775 Rev F Gabinete de nivelaci n Calce 1 1...
Page 61: ...61 of 78 P N 1094808001 Doc 94775 Rev F 2 3 Conexi n de la mesa al gabinete 875 22 2mm x18 1...
Page 68: ...68 of 78 P N 1094808001 Doc 94775 Rev F 0 472 12 0 mm M6 x2...