WRONG
Page 2 of 6
939510100 Rev B
®
1.
Place leg on a clean, scratch resistant surface with holes
facing up.
2.
Assemble top shelf to leg using two (2) 1/4-20 hex head
screws (2a). Repeat for other top shelf (2b).
NOTE:
Second person required to help steady and keep
shelves upright as they are installed.
3.
Place top tray into position and
loosely
install eight (8) (for
36” easel) or ten (10) (for 56” easel) #10 x 3/8” machine screws.
Ensure that the lower and upper end caps are aligned with the
steel shelves before driving screws. Leave screws loose. Make
sure the gap between the top cap and top shelf ends are aligned
(3a) and there is no gap between the end cap and the top tray
(3c) to ensure proper squareness. Tighten all #10 x 3/8”
machine screws.
2a
2b
1
3
CORRECT
SEE NOTE
3b
3a
NOTE:
Prop easel leg up to allow clearance for
the lower end cap alignment to shelves.
WRONG
CORRECT
TOP VIEWS
BOTTOM VIEWS
NO GAP
between
the end cap and
the top tray.
3d
3c