
October 2018
Page 12 of 12
UPV Series Storage
UPV Series
⌷ⷧ㩫
UPV Series
ꅂ뭪
UPV Series
♝侜
Assembly Instruction
兓孔広㢝
눥ꍲꐺ
俓䵚崻㢝㦇
13
14
4.2*19mm
M6
M6*7
15
Adjust the glide to align the locker before ganging if
necessary. And to adjust the hinge to align the gap of doors.
Ⱁ㦘榏尐᧨庆⦷⦉⸩㩫⃚ⓜ庒唑㻃厩䫽≬㓏㦘㩫⺈營᧨
⦉⸩⚝᧨♾ⅴ庒唑桷板㧴庒㠃桷⃚梃䤓梃椨
㉔尐㉫ሻ抲俟ሼቮⓜᇬኍኁኦቊዊአኈዙቑ浧ሸት
嵎㠃ሺሲቃሸሧᇭኦቿቋቑ椨栢ት嵎㠃ሼቮቂቤቒኯዐ
ንት嵎㠃ሺሲቃሸሧᇭ
뻹끉뼑陲끥녕鞽녚렍ꌱ뇊ꇡ뼍韥낹뼩陥뼞놹꾅鞵ꄱ넩
麑ꌱ눥놽뼩늱ꫭ끉鞭ꍡ隕陲뙞냹눥놽뼩鵹꽩넍閹陞냹
ꎓ띥늱ꫭ끉
Install white board and soft board first and then align the doors with soft board
The door should be flush with soft board.
⏗⸘孔䤌㨎♙懾㨎᧨⃚⚝庒㠃㩫桷✛懾㨎᧨㩫桷✛懾㨎槱䦇ᇭ
ቡሽኸዌኁእኹዙኦቋኚኲእኹዙኦት♥ቭⅧሴᇬቀቑ㈛ᇬኦቿትኚኲእኹዙ
ኦቋኲአእቍቮቫሩ♥ቭⅧሴቡሼᇭኦቿቋኚኲእኹዙኦቒ㙒ራቮᇭ
ꏱ놵쀉넩뱭ꚩ麑꿵ꭁ뺹뱭ꚩ麑ꌱ렍뼑鲙넁鵹꽩ꌱꭁ뺹뱭ꚩ麑꿵驍ꄵ섽
뇊ꇡ겑룑늱ꫭ끉鵹꽩鱉ꗍ麑겑ꭁ뺹뱭ꚩ麑꿵ꯍ뵾넩鷍꽩꼱뼞鱽鲙
The soft board is closed to edge of white board in upper side and closed to the
wooden frame on right side .
懾㨎ₙ扈槯營䤌㨎᧨∶扈槯營∶㨎ᇭ
ኚኲእኹዙኦቒₙ捷ቑኸዌኁእኹዙኦቑ傐ᇬ⚂⌃槱ቑኃአኦኲዉዙኽ⚠
ሴቤቮᇭ
ꭁ뺹뱭ꚩ麑鱉쀉넩뱭ꚩ麑넍閵녚녅ꍡ閵낹둲냱ꈑ鲠섽隕꿙ꌭ둲넍驍ꓩ뺹
ꆽ넹냱ꈑ鲠셎鱽鲙