®
Page 10 of 11
18)
Attach the ceiling bracket to the top of
the vertical channel.
19)
Secure crossbar to the ceiling grid.
20)
Attach slotted adjustment bracket to the
cross bar and fully tighten screw.
21)
Attach slotted adjustment bracket to the
ceiling bracket. Be sure not to fully tighten
the screws.
Attach Column
1360037001 Rev A
5
of
9
8-18 x 1/4"
8-18 x 3/8"
8-18 x 1/4"
Gold #8-18 x .360"
18
19
21
20