Steelcase Huddleboard Manual Download Page 3

Page 3 of 4

939504755 Rev F

®

Tray Assembly and Installation

1.

 Align and mount brackets (A) to respective 

panel or structural wall (drywall).

NOTE:

 For Architectural mountings, mount 

brackets (A) 6” inboard to the end of tray location. 
For all other panel systems, mount brackets at 
desired height.

2.

 Slide end caps (B) on both ends of tray (C) and 

fasten with screws.

3.

 Position assembled tray (C) on bracket (A) and 

attach with screws.

NOTE:

 For 72” tray assemblies, 4 sets of brackets 

are required to support tray.

Detail of locking tab for Avenir and Series 9000 
bracket. Lock bracket into panel, position assembled 
tray and attach with screws.

PANEL/STRUCTURAL (DRYWALL) TRAY

Avenir

®

Series 9000

®

 

and
Answer

®

Structural 
(drywall)  
brackets

B

C

A

Summary of Contents for Huddleboard

Page 1: ... by people who want to help you Outside the U S A Canada Mexico Puerto Rico and the U S Virgin Islands call 1 616 247 2500 Or visit our website www steelcase com 2012 Steelcase Inc Grand Rapids MI 49501 U S A Printed in U S A Page 1 of 4 939504755 Rev F MARKERBOARDS Hanger Hooks Ledge Grabbers Flip Chart Pegs Marker Grip PANEL STRUCTURAL TRAY MOBILE EASEL ...

Page 2: ...e hanger hooks over corner trim NOTE Huddleboard boards are not designed to be ganged together Recommended Markers EXPO dry erase markers from Sanford Maintenance Clean with warm soapy water wipe with sponge and allow to air dry Attaching Ledge Grabbers Slide the ledge grabbers over top of hanger hooks Attaching Flip Chart Pegs 1 Push two pegs over edge of board 2 Position pegs to fit holes in fli...

Page 3: ...nt brackets at desired height 2 Slide end caps B on both ends of tray C and fasten with screws 3 Position assembled tray C on bracket A and attach with screws NOTE For 72 tray assemblies 4 sets of brackets are required to support tray Detail of locking tab for Avenir and Series 9000 bracket Lock bracket into panel position assembled tray and attach with screws PANEL STRUCTURAL DRYWALL TRAY Avenir ...

Page 4: ...ng caster option is included install locking casters in the two front positions 2 Remove tray G from sub board H 3 Angle sub board H to engage upper brackets D and then rotate until vertical 4 Align sub board to lower brackets D through rectangular window in sub board J 5 Slide sub board downward to fully engage to easel 6 Assemble tray G with screws Large Boards Can be mounted horizontal and vert...

Reviews: