D.

 

For

 

non

seismic

 

applications,

 

anchor

 

the

 

upright

 

and

 

base

 

assemblies

 

to

 

the

 

slab

on

grade

 

per

 

the

 

following

 

configurations

 

using

 

¾”

 

diameter

 

x

 

5½”

 

long

 

anchor

 

bolts.

  

The

 

recommended

 

installation

 

torque

 

for

 

theses

 

anchor

 

bolts

 

is

 

150

 

foot

pounds.

  

Anchor

 

holes

 

are

 

to

 

be

 

vacuumed

 

out

 

before

 

inserting

 

the

 

anchor

 

bolts.

 

Proper

 

Anchor

 

Configurations

 

For

 

Single

 

and

 

Double

 

Sided

 

I

Beam

 

Cantilever

 

Racks

 

Single

 

Sided,

 

I

Beam

 

Cantilever

 

Anchor

 

Configuration

 

 

Top

 

View

 

 

Double

 

Sided

 

I

Beam

 

Cantilever

 

Anchor

 

Configuration

 

 

Top

 

View

 

 

Step

 

#7:

 

Clean

­

up:

 

 

A.

 

Vacuum

 

all

 

dust

 

and

 

debris

 

associated

 

with

 

setting

 

anchors.

 

 

B.

 

Dispose

 

of

 

all

 

dunnage,

 

strapping

 

and

 

debris.

 

Sweep

 

the

 

floor

 

with

 

a

 

broom

 

if

 

necessary.

 

 

If

 

you

 

have

 

any

 

further

 

questions,

 

contact

 

your

 

local

 

Steel

 

King

 

Representative

 

for

 

customer

 

assistance

 

or

 

contact

 

Steel

 

King

 

Industries

 

directly

 

at

 

(800)

 

826

0203.

 

 

 

Summary of Contents for I-Beam Cantilever

Page 1: ...I Beam Cantilever Installation and Assembly Manual Steel King Industries Inc 2700 Chamber St Stevens Pont WI 54481 800 826 0203 www steelking com info steelking com...

Page 2: ...ll as damage to property Contact Steel King Industries or your local Steel King Representative for the name and contact information of a qualified installer Users of this information agree to indemnif...

Page 3: ...tion B Snap a chalk line establishing the front edge of the upright bases The chalk line should run the entire length of the row of rack Step 4 Assemble I Beam Cantilever Rack Recommended tools Air co...

Page 4: ...Inc I Beam Cantilever Installation Guide 4 B Mark the arm elevations on the uprights The marks should be below the top of the arm end plate so as not to show after the arm is bolted in place Mark Arm...

Page 5: ...ntilever Rack Continued C Bolt the arms and the bases to the uprights using the diameter x 2 long bolts Torque the bolt to 200 ft lbs Step 5 Erect Upright Columns Recommended tools Fork truck or other...

Page 6: ...tand the pre assembled uprights with arms attached Please be careful here to protect the floor B For each row assemble a starter bay A starter bay includes two preassembled uprights with attached arms...

Page 7: ...rights are to be erected this should be the bay with the X bracing tightened in place Step 6 Square Plumb Shims and Anchor Bolts A Square the bases of the uprights on the chalk lines B Plumb the uprig...

Page 8: ...rting the anchor bolts Proper Anchor Configurations For Single and Double Sided I Beam Cantilever Racks Single Sided I Beam Cantilever Anchor Configuration Top View Double Sided I Beam Cantilever Anch...

Page 9: ...TH RESPECT TO ANY SUBSTITUTION OF PARTS OR HARDWARE NOT APPROVED IN WRITING BY SELLER THE INSTALLATION DETAIL DRAWINGS THAT FOLLOW ARE INTENDED AS BASIC GUIDES FOR INSTALLATION OF THE STANDARD COMPONE...

Reviews: