8 |
P a g e
Rev 10/2012
INSTALLATION INSTRUCTIONS FOR MA6020 & MA6023
Note:
Silicone joints & seams where needed
Note: Determine the drain setup. There needs to be a 3/8 inch
diameter hose connected from the steam box to the main drain.
1.
Place shower tray in the corner where it will be
permanently located. Note: The handing (R/L) of your
unit determines which side the mounting plate goes (ie:
A right handed unit has the mounting plate on the right
side)
2.
Make sure the installation holes for the electric parts
and the steam generator are lined up with installation
holes; connect it with M6X25 Hex bolts.
3.
Insert the half-moon shaped rubber seals (shown in
picture below) onto the left, right and top edge of glass
A.
4.
Install angle brackets over the installation holes of
glass A, connect with connector bolts (make the
connection snug, but loose enough to make
adjustments.) Connector bolt caps will be installed
when final tightening is complete. Connect water
supply lines and electrical lines.
5.
Place bottom edge of glass A into the slot on the base
as shown. A small amount of soap or lubricant on the
gaskets will help with installation. Helpful hint: install
the shelf brackets to back panel before positioning in
base. See section 3.19 for more info.