14
2.2
Commissioning
2.2.1 Filling the water heater
1. Close the drain tap;
2. Open the cold water tap to the water
heater and open all taps where hot
water can be drained for de-
aeration. The water heater is filled
as soon as cold water flows from all
taps;
3. Close all hot water taps.
2.2.2 Putting into operation
1. Check whether the water-heater
has been filled with water and
whether the gas supply to the water
heater is open;
2. Turn the temperature control knob
clockwise and place the control knob
in the ‘PILOT’-position (
✸
);
3. Remove the outer and inner door of
the combustion chamber;
4. Keep the control knob pushed-in and
press the piezo-ignitor several times
until the pilot burns (see figure 6);
5. Keep the control button (
✸
) pushed-
in for approximately 20 seconds.
After releasing the button the pilot
should remain burning. If the pilot
extinguishes you should wait 5
minutes before repeating the ignition
procedure. The size of the pilot flame
can be adjusted (see also “Pilot
adjustment”);
6. Subsequently remount the outer and
inner door; see “Mounting the inside
door”;
7. Turn the control button to the ‘ON’ ( )
position;
8. Check the burner pressure setting
(see figure 9) and, if necessary,
adjust this in accordance with the
technical data (see par. 1.4);
9. Place the temperature control button
in the correct position, preferably
position 4 (approximately 60°C). The
appliance will now operate fully
automatically.
Figure 6 - Operation of the gas control
block
AOS 0484
Summary of Contents for PRV 30 NORS G
Page 9: ...9 Figure 3 Dimensions AOS 0481 ...
Page 28: ...0307 993 R0 28 ...