Instruction Manual
2
Package contents
• 1 x cable access box
• 2 x mounting brackets with screws and wingnuts
• 4 x large nylon split bushings
• 7 x small nylon split bushings
• 1 x diecut outline
• 1 x quick-start guide
Requirements
• A table surface for installation.
• Up to nine cables for routing through the box.
• A Phillips head screw driver.
• A saw or other cutting tool.
Cable installation
1. Using a Phillips head screwdriver (sold separately) remove the panel screws from
either side of the
cable routing panels
that contain the hole(s) you’d like to occupy
with the cable(s).
2. Remove the
cable routing panel
by sliding the screwdriver into one of the
cable
holes
and prying the cable panel up.
3. Slide your cable(s) into any available
cable hole(s)
that match the width of your
cable(s). Be sure to place thicker cables in the larger holes and thinner cables into
the smaller holes.
4. Place the
cable routing panel
back into it’s slot and replace the screws.
5. Inside the box, wrap the
large nylon split bushing(s)
(included) around the
larger cable(s) and the
small nylon split bushing(s)
(included) around the smaller
cable(s).
6. Slide each of the
nylon split bushings
into the cable hole.
Repeat steps 1 through 5 to install additional cables using the other
cable panel
.