12
30SS, 36SS, 45SS
V7.10.24.12
Assembly Instructions
Step 7: Auger and Transmission Control Cables
Control cables are preset at the factory, but may require additional adjustment for optimal operation. Control cables
require periodic inspection and maintenance to maintain optimal performance.
1. Locate the black cable on the right side (standing from the operator position) of the snow blower. Ensure the
cable is properly seated in the plastic guide pulley at the rear of the chassis.
2. Attach the cable to the threaded end under the drive control handle. The cable adjustment tube with Z rod may
need to be attached to the bottom of the handle.
3. Screw clockwise to secure until all threads are engaged in the adjustment tube. Tighten lock nuts when correct
tension
is
achieved.
4. The drive and impeller cables will be at correct tension when the cables are properly attached to the handles and
the cable has a 1 inch deflection to either side when pushed with a finger as shown.
Repeat the same process for the Auger/Impeller engagement cable on the left side of the snow blower.
Correct amount of
deflection shown
Need Help With Assembly?
(919)-550-3221
Transmission
Control Cable
Auger/Impeller
Control Cable
Adjustment Tube
Preset and attached to
handle at factory.
Cable End
Connector
Cable End Connector—All threads
should be inside the adjustment tube.
Then lock into position with the jam nut.