11
Heat Up: It takes around 12 minutes to reach 150° C.
Once your machine has reached the designated temperature:
• Position the garment and application and proceed to press.
• Lower and lock the heat platen into the press position. This procedure will start the automatic
timing process.
• The timer will automatically count down and audibly signal you to lift the heat platen into the
“UP” position when the press cycle is complete.
• The time will automatically re-set and you are ready to continue with the next application.
NOTE
23 °C The lowest temperature the unit will display.
96°C The lowest set temperature possible.
221°C The highest set temperature possible and the highest temperature the unit willlay.
PRINTING / PRESSING
Summary of Contents for Hot Berry
Page 1: ...STAHLS HOT BERRY OPERATING MANUAL...
Page 2: ...HOT BERRY...