Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Enclosure must not be damaged.
• If necessary, remove foreign bodies.
• If necessary, clean the connection chamber.
• Check if the conductors have been inserted correctly.
• Check if all screws and nuts have been tightened firmly.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check if all conductors have been clamped firmly.
• Observe the line voltage.
• Seal the unused cable entries with plugs certified according to Directive 2014/34/EU
or IEC and unused drilled holes with stopping plugs certified according to Directive
2014/34/EU or IEC.
9
Operation
Only type 8570/12 and 8575/12 plugs from R. STAHL may be used.
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
WARNING
Damage or destruction of the device by arc and high pressure is possible if
improper switching operations are used!
Non-compliance can result in severe or fatal injuries.
• Quickly switch the device on and off completely.
• Avoid switching positions between 0 and I (ON and OFF).
The coupler socket may only be operated when fully mounted.
The coupler socket can be switched only with the plug inserted.
If the plug has been disconnected, close the hinged cover with the bayonet
ring.