Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Inspect device for damage.
• If necessary, remove foreign bodies.
• If necessary, clean the connection chamber.
• Check if all screws and nuts have been tightened firmly.
• Check the tightening torques.
9
Operation
Zero point adjustment
A zero point adjustment can be carried out, if the black pointer is not on the zero position
at 0 V, after installing the ammeter.
Requirement:
• The ammeter is installed and disconnected from the mains.
Zero point adjustment:
• Use the screw on the bottom right to adjust the zero point.
Comparison of measured values
• Use the red marker to set a nominal value (upper screw).
Measuring range assignment
• With the ammeters for 1 A and 5 A converter connection, it is possible to assign rapidly
and easily the measuring range on site due to the scale plate that can be pushed in
laterally.
10
Maintenance and repair
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation and function before commis
-
sioning.
• Comply with the national regulations.
NOTE
The scale of ammeters with direct indication may by no means be replaced!
WARNING
Risk of electric shock or malfunctioning of the device due to unauthorized
work!
Non-compliance can result in severe injuries and material damage.
• Work performed on the device must only be carried out by appropriately
authorized and qualified electricians.