STA-RITE HMS-1FL Series Owner'S Manual Download Page 2

Deep Well Installation

U

Un

nd

de

err   c

ce

errtta

aiin

n   c

co

on

nd

diittiio

on

ns

s,,   h

ho

orriiz

zo

on

ntta

all   m

mu

ullttii--

s

stta

ag

ge

e   p

pu

um

mp

ps

s   c

ca

an

n   d

de

ev

ve

ello

op

p   e

ex

xttrre

em

me

elly

y   h

hiig

gh

h

p

prre

es

ss

su

urre

e..   IIn

ns

stta

allll   a

a   p

prre

es

ss

su

urre

e   rre

elliie

eff   v

va

allv

ve

e

c

ca

ap

pa

ab

blle

e  o

off  p

pa

as

ss

siin

ng

g  e

en

nttiirre

e  p

pu

um

mp

p  ffllo

ow

w  a

att  7

75

5  P

PS

SII..

D

Do

o   n

no

ott   a

allllo

ow

w   p

pu

um

mp

p,,   p

prre

es

ss

su

urre

e   tta

an

nk

k,,   p

piip

piin

ng

g,,   o

orr   a

an

ny

y

o

otth

he

err   s

sy

ys

stte

em

m   c

co

om

mp

po

on

ne

en

ntt   c

co

on

ntta

aiin

niin

ng

g   w

wa

atte

err   tto

o   ffrre

ee

ez

ze

e..

F

Frre

ee

ez

ziin

ng

g  m

ma

ay

y  d

da

am

ma

ag

ge

e  s

sy

ys

stte

em

m,,  lle

ea

ad

diin

ng

g  tto

o  iin

njju

urry

y  o

orr  ffllo

oo

od

d--

iin

ng

g..   A

Allllo

ow

wiin

ng

g   p

pu

um

mp

p   o

orr   s

sy

ys

stte

em

m   c

co

om

mp

po

on

ne

en

ntts

s   tto

o   ffrre

ee

ez

ze

e   w

wiillll

v

vo

oiid

d  w

wa

arrrra

an

ntty

y..

N

NO

OT

TIIC

CE

E::  Support pump base to avoid strain on casing adapter

or pump. Lack of support can damage adapter or pump.

Figure 2 shows casing adapter bolted directly to pump body.

Shallow Well Installation

N

NO

OT

TIIC

CE

E::   If no foot valve is used, install 1” check valve in

horizontal line.

Priming the Deep Well Pump

To prime pump, completely close the priming valve located
just below the suction opening by turning screw clockwise.
This valve will be left closed during operation in a deep well
installation. See Figure 1.

Close regulator adjusting valve, located on end of regulator,
by turning stem clockwise. See Figure 1.

Remove priming plug from top of regulator valve, see Figure
1, and fill with clean water. Replace plug.

Start pump and run a few moments.

If pressure does not build up, remove priming plug and refill
with more water. All of the trapped air in pump body was not
removed.

Restart pump.

When pump is completely primed and builds up pressure,
slowly open the regulator valve, (turn counter-clockwise), and
observe the pressure reading on the pressure gauge.

When the pump reaches a point where it will lose prime, cavi-
tation noise can be heard.

The best, or correct, pressure gauge setting is approximately
3 pounds higher than the pressure gauge reading was when
the pump started to lose prime.

If pump loses prime, repeat the priming procedure above and
this time open regulator valve only until the correct pressure
reading is reached.

If a vacuum gauge is available, screw it into the 1/8” AVC
tapping on front of tank body. Adjust regulator until 20” of
vacuum is registered on the gauge. Tighten locknut on regu-
lator. This method will give maximum performance of the
unit.

2

Priming

Valve

Pipe fittings not furnished

Drain

Plug

Drive Line

Suction 

Line

Plastic Pipe
Adapter (2)

Plastic Hose

      (2)

Hose Clamp

      (2)

To Service

Regulator Adjusting
Valve

Priming Plug

Regulator
Valve

1" Close nipple &
90 Elbow

278 1093

To Service

Priming Plug

Regulator
Valve

279 1093

To  Service

Priming

Valve

From

Well

1" Pipe Plug

Plastic Pipe

Adapter

Hose Clamp

Plastic

Hose

Pipe fittings not furnished

Priming Plug &
1/2" Street Elbow

240 1093

F

Fiig

gu

urre

e  1

1  –

–  D

De

ee

ep

p  W

We

ellll  IIn

ns

stta

alllla

attiio

on

n

F

Fiig

gu

urre

e   2

2   –

–   W

We

ellll   C

Ca

as

siin

ng

g   A

Ad

da

ap

ptte

err   b

bo

olltte

ed

d   d

diirre

ec

cttlly

y  

tto

o  p

pu

um

mp

p

F

Fiig

gu

urre

e  3

3  –

–  S

Sh

ha

allllo

ow

w  W

We

ellll  IIn

ns

stta

alllla

attiio

on

n

Summary of Contents for HMS-1FL Series

Page 1: ...et t P Pu um mp ps s H HM MS S 1 1F FL L S Se er ri ie es s M MO OD DE EL LS S S ST TA A R RI IT TE E I IN ND DU US ST TR RI IE ES S 2 29 93 3 W Wr ri ig gh ht t S St t D De el la av va an n W WI I 5...

Page 2: ...turning stem clockwise See Figure 1 Remove priming plug from top of regulator valve see Figure 1 and fill with clean water Replace plug Start pump and run a few moments If pressure does not build up r...

Page 3: ...water is not being pumped turn off pump and repeat priming process N NO OT TI IC CE E If a bolt on jet is being used after pump is primed close the priming valve during operation as a shallow well pum...

Page 4: ...shown in Figure 7 3 Attach the incoming power leads to the two outer screws on the pressure switch as shown in Figure 6 4 Attach the ground wire to the grounding connections as shown in Figure 6 5 If...

Page 5: ...roducts listed below that they will be free from defects in mater ial and workmanship for the Warranty Period from the date of original installation or manufacture as noted P Pr ro od du uc ct t W Wa...

Page 6: ...6 1 2 4 5 6 7 8 9 10 10A 10B 22 25 23 24 3 225 0993 8 11 12 12A 12B 13 14 15 16 17 18 18A 19 20 21 26 27 EXPLODED VIEW...

Page 7: ...3 27 12A Wear Ring 1 L23 9 L23 9 L23 9 12B Capscrew 1 4 20 x 3 Lg 3 U30 528SS U30 528SS U30 528SS 13 Diffuser Ring OH SG 1 L21 1 L21 1 L21 1 14 Pipe Plug 1 2 NPT 1 U78 59ZPS U78 59ZPS U78 59ZPS 15 Pre...

Page 8: ...1A Seat 1 J66 16 2 Diaphragm Assembly 1 J212 16B 2A Guide 1 J42 5 2B Stem 1 J62 9 2C Diaphragm 1 J20 16 2D Spring Follower 1 J43 31 2E Lockwasher 1 J43 23ZP 2F Nut 1 4 20 1 U36 36ZP 3 Spring 1 J24 13...

Reviews: