background image

Three Phase: NEMA design B with Class F insulation.
Suitable for operation in liquids with a maximum temperature
of 60°C (140°F).
Check rotation before installing pump in sump. Cutter should
rotate counterclockwise when viewed from the bottom (suc-
tion side) of pump. If not, reverse any two leads to motor to
reverse direction of rotation.
All Motors: See motor nameplate for voltage, Hertz, phase,
and full load current. Make sure that power supply is the cor-
rect voltage and adequate to start and run pump. To be sure
that wiring is correct, test run pump briefly before installing
in sump. Oil-filled seal plate will protect shaft seals for a
brief dry run which can save much troubleshooting time later
if there is a problem with the installation. See Table I, Page
2, for electrical data summary.

OPERATION

Hazardous voltage and hazardous
cutter. Disconnect electrical power
and keep hands away from pump
inlet opening when working on or
handling pump for any reason. Do
not use automatic reset controls
with this pump.

Accidental rotation

of the cutter with hands in the cutter

area can cause loss of fingers.

Lubrication:

The motor bearings of oil filled models are

lubricated by oil in the motor. The motor bearings of air-filled
models are of the sealed type. The motor is equipped with
two independent shaft seals with an oil filled reservoir
between them for seal lubrication.

SG12/SG13 Series:

Not equipped with thermostats or leak

sensor probe. Check the seal condition quarterly in heavy
duty service or annually in light duty service.

SGC12/SGC13 Series:

To eliminate unnecessary removal

of the pump from the sump for routine seal inspection, moni-
tor the seal condition via the leak detection circuit.

NOTICE:

Failure to monitor the seal condition voids warran-

ty. Motors damaged by flooding due to seal or O-Ring failure
are not covered under warranty.

Grinder Assembly:

The grinder unit consists of a cutter

rotating inside a stationary cutter ring. Persistent jamming
and clogging of the pump indicates dull or worn grinder
parts. If the cutter ring is dull, reverse it to renew the cutting
edges. If the cutter ring is worn from abrasives, replace it.

NOTICE:

Normal domestic sewage will cause very little

dulling or wear of the grinder parts. However, pumping abra-
sives (such as fine sand) or fabrics (such as articles of
clothing) will greatly increase wear and tear on the grinder
and may make it necessary to replace the grinder assembly
frequently.

MAINTENANCE

The Key numbers given in these procedures refer to the
exploded views. See page 

8

 for SG12/SGC12/

SG13/SGC13 and page 10 for SGC20.

Pump Removal:

Hazardous voltage and hazardous
cutter. Before removing pump from
basin for service, always discon-
nect electrical power to pump and
control switch.

Always keep hands

and other body parts away from
grinder assembly in pump suction.

1.

After the basin cover is removed and the necessary dis-
charge piping disconnected, lift the pump from the
basin.

2.

Place the pump in a suitable area where it can be
cleaned thoroughly.

3.

Remove all scale and deposits from the pump.

4.

Submerge the complete pump in a disinfectant 
solution (chlorox or chlorine) for at least an hour 
before disassembly.

NOTICE:

SG12/SGC12/SG13/SGC13 Series – Replace

motor oil  with new oil whenever the motor housing is
opened for service.

Grinder Disassembly:

Hazardous voltage and hazardous
cutter. Before removing pump
from basin for service, always
disconnect electrical power to
pump and control switch.

Always

keep hands and other body parts
away from grinder assembly in
pump suction.

1.

Follow instructions under “Pump Removal’’.

2.

After removal and disinfecting, lay pump on its side and
remove drain plug from seal plate. Drain oil from oil filled
motors. (If oil is not contaminated, it may be reused.)

3.

Remove six cap screws (Key No. 33, SG12/SGC12/
SG13/SGC13; Key No. 1, SGC20) securing the volute
(Key No. 32) to the seal plate (Key No. 20) and remove
the volute.

4.

Inspect the cutter, cutter ring, impeller, and volute (Key
Nos. 29, 34, 2

8

, and 32) for wear. Replace any worn

parts.

7

Summary of Contents for 12SG1-1011

Page 1: ...is pumping domestic sewage and waste water containing solids Do not pump metal particles rocks or other hard objects 7 Do not pump corrosive or flammable liquids with this pump DESCRIPTION These subm...

Page 2: ...cm Minimum Basin Diameter Simplex 24 61 cm Minimum Basin Diameter Duplex 36 91 cm Dimension SGC20 Vertical Discharge Pipe Length Disch Pipe Height X X 25 7 16 64 5cm Locking Rail Length Basin Depth Y...

Page 3: ...066 8 46 1168 4 62 15 7 17 431 8 18 457 2 16 406 4 7 37 187 1 22 88 581 Simplex 48 1219 2 54 1371 6 2 92 74 1 17 431 8 21 533 4 16 406 4 9 67 245 6 22 88 581 60 1524 66 1676 4 2 92 74 1 17 431 8 27 68...

Page 4: ...SGC12 and SG13 SGC13 This difference is required by the difference in size between the two pumps Make sure that you use the correct sequence for your pump or the piping assembly will not mount on the...

Page 5: ...the tapped hole provided in the top of the pump 11 SG12 SGC12 SG13 SGC13 Thread the locking rail into the movable flange mount the locking bracket and tight en The movable parts of the SG12 SGC12 SG1...

Page 6: ...1 T1 T4 T5 T8 L2 P2 Ground Green Power Cable 14 4 Black Common White Main Red Start Black White Red T1 T1 T1 T1 T4 T4 T4 T5 T6 T7 T7 T7 T8 T8 T8 T5 T5 T2 T6 T2 T2 T9 T9 T6 T6 T5 T8 T3 T3 T3 T3 Leak Se...

Page 7: ...ing inside a stationary cutter ring Persistent jamming and clogging of the pump indicates dull or worn grinder parts If the cutter ring is dull reverse it to renew the cutting edges If the cutter ring...

Page 8: ...l new O Rings and seals during re assembly 1 Press a new ceramic seal head into place in the seal plate Be sure that you do not damage the seal face when sliding it over the shaft shoulder 2 Clean out...

Page 9: ...For Series For Series SG12 SGC12 SG13 Key SGC13 SGC20 No Part Description W52439L W52440L 9 Base Pipe W52435 W52433F 10 Stationary Flange W52285 W52287 11 O Ring 22302 2 22302 2 12 Movable Flange W52...

Page 10: ...10 13 14 15 16 17 18 19 20 22 23 27 24 25 26 22 31 32 33 34 35 36 28 29 30 1 2 1 10 2 3 4 7 8 1 12 11 21 1944 0895...

Page 11: ...4 16504 23 Retaining Ring 1 25395 25395 24 O Ring 1 25379 25379 25 Back Plate SG12 SGC12 Series 1 W52023 W52023 25 Back Plate SG13 SGC13 Series 1 W52033 W52033 26 1 4 20x3 4 Socket Head Cap Screw SS 3...

Page 12: ...12 12 13 15 16 14 17 18 19 1 4 5 6 7 8 9 11 10 21 20 22 22 23 24 25 26 28 32 29 30 31 34 35 36 27 1 1 2 2 9 5 7 8 6 1 2 3 4 37 1945 0895...

Page 13: ...2039 W52037 W52039 W52163 29 Cutter 1 W52259 W52259 W52259 W52259 W52259 30 Impeller Retainer 1 W52093 W52093 W52093 W52093 W52093 31 3 8 16x1 Socket Hd Cap Screw SS 1 10672 10672 10672 10672 10672 32...

Page 14: ...ase motors must be protected by three leg ambient compensated extra quick trip overload relays of the recommended size or the warranty is void Your only remedy and STA RITE s only duty is that STA RIT...

Page 15: ...pompe ad quatement entretenue 6 N utiliser la pompe qu aux fins pour lesquelles elle est pr vue c est dire le pompage des eaux d gout et des eaux us es domestiques contenant des mati res solides Ne pa...

Page 16: ...n simplex 24 po 61 cm Diam tre minimum du bassin duplex 36 po 91 cm Dimensions SGC20 Longueur verticale du tuyau de refoulement Hauteur du tuyau de refoulement X X 25 7 16 po 64 5cm Longueur de la gli...

Page 17: ...67 245 6 22 88 581 SGC20 48 1219 2 54 1371 6 2 69 68 3 22 558 8 21 533 4 32 812 8 9 228 6 6 56 166 6 24 88 632 Duplex 60 1524 66 1676 4 2 70 68 22 558 8 27 685 8 20 508 9 228 6 11 95 303 5 24 88 632 S...

Page 18: ...les SG12 SGC12 et SG13 SGC13 Cette dif f rence est requise tant donn que les dimensions de ces deux pompes sont dif f rentes S assurer de suivre le bon ordre de mon tage en fonction de la pompe sinon...

Page 19: ...effet en haut de la pompe 11 SG12 SGC12 SG13 SGC13 Glisser la glissi re de blocage dans la bride mobile poser le support de blocage et le serrer Les pi ces mobiles du syst me pour les s ries SG12 SGC1...

Page 20: ...ontre les surcharges doit tre utilis sur les moteurs monophas s si un pan neau de commande Sta Rite n est pas install Se reporter au Sta Rite pour acheter cet ensemble Figure 6 Connexions lectriques d...

Page 21: ...Le broyeur de cette pompe se compose d un couteau tournant l int rieur d une couronne de broyage Un coincement et un blocage constant de la pompe indiquent que les pi ces du broyeur sont mouss es ou...

Page 22: ...s lors du remontage 1 Pousser la t te d un joint en c ramique neuf en place dans la plaque d tanch it Faire bien attention de ne pas endom mager la face du joint d tanch it lorsque l on glisse le join...

Page 23: ...2 1 2 13352 2 8 Bride de base S11787 S11787 9 Tuyau de base W52435 W52433F 10 Bride fixe W52285 W52287 11 Joint torique 22302 2 22302 2 12 Bride mobile W52289 W52290 13 Barre de blocage W52293 W52293...

Page 24: ...10 13 14 15 16 17 18 19 20 22 23 27 24 25 26 22 31 32 33 34 35 36 28 29 30 1 2 1 10 2 3 4 7 8 1 12 11 21 1944 0895...

Page 25: ...arr t 1 25395 25395 24 Joint torique 1 25379 25379 25 Plaque d appui S ries SG12 et SGC12 1 W52023 W52023 25 Plaque d appui S ries SG13 et SGC13 1 W52033 W52033 26 Vis chapeau t te creuse en acier ino...

Page 26: ...12 12 13 15 16 14 17 18 19 1 4 5 6 7 8 9 11 10 21 20 22 22 23 24 25 26 28 32 29 30 31 34 35 36 27 1 1 2 2 9 5 7 8 6 1 2 3 4 37 1945 0895...

Page 27: ...037 W52039 W52163 29 Couteau 1 W52259 W52259 W52259 W52259 W52259 30 Support du couteau 1 W52093 W52093 W52093 W52093 W52093 31 Vis chapeau t te plate en acier inoxydable de 3 8 16 x 1 po 1 10672 1067...

Page 28: ...de surcharge tripolaire thermocompens d clenchement extr mement rapide du calibre recommand sinon la garantie sera nulle et non avenue Le seul recours de l Acheteur et la seule responsabilit de STA R...