Hardware setup: Flash & Debug
7
Step 1
Remove the battery
and plug the BlueNRG-Tile on its
host board, move switch SW2 and SW3 in position 2-3
Remove the battery
and plug the BlueNRG-Tile on its
host board, plug the host board on any Nucleo ST-Link
Flash
Flash & Debug with supported IDEs
10 pin SWD/UART connector
5 pin SWD connector
Alignment connectors
SW2 and SW3
in position 2-3
Remove
the battery