background image

 

( 5 / 18) 

 E-STOP: 

This switch protects the operation of the base unit from undesired operation and its press turns the 
Controller  to  an  inactive  state.  E-STOP  is  a  red  color  button.  Once  the  E-STOP  button  has  been 
pressed,  system  is  locked  in  an  inactive  position  and  the  button  must  be  rotated  clockwise  to  be 
released to continue operation. 

 
GO:

  

This green button turns the selected  channels of Hoist Control system ON when it is  active. Once 
the GO button has been depressed, the energizing of the hoists is turned off. GO button is blinking 
when status of system is activated and you’re able to move hoist 

 
 
 
DIRECTION SWITCHES:  

They  allow  changing  the  direction  of  movement  for  each  motor/hoist  separately  or  in  groups.  The 
LED located close to the switch indicates the direction of movement.  

 
DIRECTION SWITCH LED 

 

Green   

UP 

 

Red 

 

DOWN 

 

No light  

stays in position 

 
STATUS LED 
 

 

GREEN   

Device ready for action 

 

RED 

 

Indicates that the GO button is active 

 

ORANGE  

Indicates the activity of direction switch, LED blinks in movement  

 

E-STOP LED 

 

 

GREEN   

E-STOP system OK 

 

ORANGE  

Indicates that the system needs to be reset  

 

RED    

E-STOP is active somewhere in the system 

 

RED blinking 

E-STOP button is pressed on the device 

 

Summary of Contents for ADR24-DIGI-AHD

Page 1: ...nstallation and the use of the equipment Please read and follow these instructions carefully Always ensure that the power to the equipment is disconnected before opening the equipment or commencing an...

Page 2: ...dards of design manufacture and the intended use of this equipment Do not operate in an explosive atmosphere Do not operate this equipment in the presence of flammable gases or fumes Operation of any...

Page 3: ...sponding to each motor to the desired position According to the position of lever hoists act as follows o UP Lever in upper position o STAY Lever in middle position o DOWN Lever in lower position Push...

Page 4: ...e AHDseries and GMDseries via digital 5 pin cable connector During standard operation the full 5core cable must be equipped with Neutrik 5 pin connectors Maximum cable length is 1000m The data connect...

Page 5: ...sts is turned off GO button is blinking when status of system is activated and you re able to move hoist DIRECTION SWITCHES They allow changing the direction of movement for each motor hoist separatel...

Page 6: ...s activated and you re able to move hoist DISPLAY TFT display which shown information about remote and also the linked controllers E STOP This switch protects the operation of the base unit from undes...

Page 7: ...ress of controller Device oeration After connection to the link the device get discovery of connected controllers The controller and remote will get paired and remote will become the master of operati...

Page 8: ...for operation Is indicated by the green STATUS LED and also GREEN E STOP LED For access to the ADR REMOTE menu please rotate encoder to the TOP ID and hold center button for cca 3s until display of M...

Page 9: ...en For creation of LOCKED LINK please anter menu LOCKED link Then all controllers that been discoverable on lnk will be added to LOCKED LINK This means that conttoller setup will work only when all co...

Page 10: ...link save operation Press middle button to save the LOCKED LINK CLEAR of LOCKED LINK please enter menu and hold middle button to clear locked link After this operation controller will not watch each...

Page 11: ...with 4 4LL which means tat 4controllers from 4 controllers is online and locked link has been activated LOCKED link ERROR This screen shown that one controller is lost from LINK Resove by re connecti...

Page 12: ...AY MENU YOu can setup backlight setup and time before screen saver will occour The setup will protect display as tft is sensible for long time operation Use carefully ABOUT MENU the about informaiton...

Page 13: ...S is start address of operation If you want to controll 24 channels consisting of 2x12 way unit you need to setup the 1st controller to adress 1 and 2nd to address 2 If you have 3x 8way you need to us...

Page 14: ...14 18 Wen you send indetify the CMD SEND command is shown ADDRESS SETUP screen...

Page 15: ...15 18 RESET SETUP screen DEVICE MENU...

Page 16: ...ufacturer at sales srs group com Warranty covers the original factory installed components of the controller and their correct functioning Warranty voids if any part or replacement components is insta...

Page 17: ...17 18...

Page 18: ...subject to change without notice Document ADR DIGI AHD_manual_M327 doc Version 3 1 Actual as of 7 June 2019 SRS Group s r o Rybnicna 36 D 831 07 Bratislava Slovakia Phone 421 2 44 681 417 Fax 421 2 4...

Reviews: