1008146 Rev. A
9
18. Install Frame Braces to Frame using 1/4-20 x
1-3/4" Bolt, 1/4" Washer (one on each side) and
1/4" Nylon Insert Locknut, Figure 13.
19. Attach Frame Braces to Tow Tube/Control Lever
Assembly using 1/4-20 x 2" Bolt, 1/4" Washers
(one on each side), and 1/4" Nylon Insert Locknut.
20. With rate gate dial set to 0, move control lever
back and forth and ensure rate gate opens and
closes fully, Figure 14. If necessary adjust Control
Lever Bracket assembly forward or necessary. Fully
tighten hardware from steps 17 and 19 that hold
Control Lever Bracket in place.
21. Install Screen into Spreader.
Figure 13
Rate Gate
Figure 14