background image

Granule Size - Dial Setting Guide

12

Handle Assembly

5.

Position spreader as shown.

Attach T-handle assembly loosely

to cross-bar of frame (39) using

(1) bolt [52] & nut [53].

NOTE: Model 58-22 has a black
plastic hopper

6.

Secure the handle braces [43] to

inside of frame using (2) bolts

[51] & nuts [53].

7.

Check for proper alignment &

then tighten all nuts and bolts at

this time.

Dial settings are approximate only. 

Product

Lbs. per 1000 Sq. Ft.

Full Rate

Half Rate

1

3.6

3.1

2

4.0

3.5

3

4.2

3.7

2

3.7

3.2

4

4.7

4.1

6

5.2

4.5

2

3

2.2

4

4.2

3.7

6

4.5

4

1

3.5

3

2

4.2

3.7

3

4.7

4

2

3.5

3

4

4.2

3.8

6

5.2

4.5

2

3.5

3

4

4.2

3.8

6

5.2

4.5

2

3.8

3.3

4

4.9

4.1

6

5.9

4.9

Mixed Fine Pellets

Fine Pellets

Small Pellets

Nitrogen Pellets Med.

Med. Pellets & Granules

Med. Pellets

Large Heavy Pellets

The Accuway has two ramps. A front side and a back side ramp.

Viewed from operators position.

The front side ramp 

2

is used to shift the spread pattern to the right.

The back side ramp 

4

is used to shift the spread pattern to the left.

NEVER, NEVER, NEVER USE ACCUWAY FRONT AND REAR RAMPS TO
SPLIT THE PRODUCT FLOW. Use only the front side or the back side.
With proper adjustment you should be able to achieve a balanced
spread pattern.

First - set the spread rate dial 

3

Now you are ready to balance the spread pattern.

A

B

3

2

1

Note the relationship of the rate gate

opening to the front side of the ramp.

Note the relationship of the rate gate

opening to the back side of the ramp.

Read Before Using

New Linkage Adjustment Procedure

1.

Set regulator dial to 1.

2.

Set lever completely to off position.

3.

Attach cable clamp (59) to ground prop with 1

1

/

4

bolt and nut and finger tighten.

4.

Route cable through clamp, then through swivel and
then tighten the cable clamp bolt just enough to allow
the cable to slide back and forth easily.

5.

Adjust sheath on cable so there is a 1/8” inch of
control wire that is visible between the sheath and the edge of the rate gate linkage.

6.

Tighten the cable clamp bolt to secure the sheath.

7.

Tighten the screw on the cable fastener to anchor the wire, making sure that the
rate gate linkage is pushed up against the dial.

8.

Trim excess wire behind cable fastener connector when finished (if necessary).

Dial Setting Information

The RATE DIAL has 9 numbers with 10 stops between each num-
ber, for accurate control of 
the spreading rate.
The dial is set with only a turn. It will automatically lock into the set
position. LINE UP THE DIAL NUMBER WITH THE DIAL INDICATOR. 

3

Summary of Contents for 24

Page 1: ...n Guide Service Manual Parts List spread with confidence It s the spread that counts It s the spread that counts For Models 24 28 58 1 800 972 6130 Fax 260 774 3416 he er ern ays d 64 er and eels P O Box 7 140 Mill Street Urbana IN 46990 USA 99 0042 ...

Page 2: ...ve of any other parts or materials are warranted for the life of the spreader not to be used for replacement or repair past original purchase Spyker Spreaders LLC will not be liable for any loss damage or expense including but not limited to consequential or incidental damages arising from the operation condition or use of the item The sole and exclusive remedy against Spyker Spreaders LLC being t...

Page 3: ... 7 75 6 Dichondra 4 oz 1 000 1 9 8 8 oz 1 000 2 1 8 12 oz 1 000 2 5 8 Pensacola Bahia 4 1 000 4 5 3 75 7 5 1 000 4 75 4 0 7 6 1 000 5 0 4 25 7 Grass Seed Spreading Chart Broadcast spreading is as old as early man In the early days of agriculture field seed ing was accomplished with hand cast broad casting The hand cast method of seed ing was a limited fac tor in growing field crops that were hand ...

Page 4: ...adjustment you should be able to achieve a balanced spread pattern First set the spread rate dial 3 Now you are ready to balance the spread pattern A B 3 2 1 Note the relationship of the rate gate opening to the front side of the ramp Note the relationship of the rate gate opening to the back side of the ramp Read Before Using New Linkage Adjustment Procedure 1 Set regulator dial to 1 2 Set lever ...

Page 5: ...uct dispensing on spreading spinner VARIABLES include condition of the spreader end the spreading spinner product build up on the casting vanes etc VARIABLES include operator habits fast or slow walking tilting spreader forward or backward or operating spreader in a level attitude Accuway How It Works A turn of the spread pattern shifter dial factors the variables Shifts the product place ment on ...

Page 6: ...l all bearings and bearing areas Method 2 Wash rinse and dry the spreader Note Drying takes time Moisture trapped in bearing areas is slow to go Immediately after drying oil all bearings and moving parts Make certain all operations are thorough Note Good Dry Cleaning is preferable to poor Wet Cleaning It is virtually impossible to have rust and corrosion on a clean dry oiled surface Again just bef...

Page 7: ...N PAGE 16 SPREADING AT ONE HALF RATE DIAL SETTINGS IS HIGHLY RECOMMENDED UNDER DAMP HUMID CONDITIONS BECOME FAMILIAR WITH THE OPERATION OF THE SPREADER BEFORE YOU PUT MATERIAL IN THE HOPPER Practice walking with the spreader opening and closing the rate gate at the appropriate times Travel at a constant speed and operate the spreader lever position Remember Open the rate gate after the spreader is...

Page 8: ...96 0003 1 Rotary Agitator Wire 13 05 94 0049 1 Spinner Cam Extension 14 SS 94 0012 1 1 Spreading Spinner 15 05 97 0019 1 Spinner Shaft Model 34 22 16 SS 90 0002 2 Roll Pin 17 SS 90 0001 1 Roll Pin 18 SS 92 0002 2 Felt Washer 19 SS 94 0009 1 Pinion Gear Model 34 22 Nylon 20 SS 94 0007 1 Hopper Bottom Bearing 21 05 34 2210 1 Axle Model 34 22 22 05 34 2204 1 Axle Gear Spinner Shaft Assy Model 34 22 2...

Page 9: ...eading at exact spread rates Optional BORDER PATROL spread pattern cut off prevents spreading on drive ways flower beds etc Extension hoppers available for models 220 299 and 20 Series spreaders Shipped Set Up Saves time and labor ENSURES proper assembly except 64 Stainless steel frames ensure longer spreader life easier maintenance and present a quality image High grade plastic non corroding whee...

Reviews: