Waukesha Cherry-Burrell
Maintenance
11/2012
95-03057
Page 47
Maintenance of Horizontal
Votator II
DANGER:
Before doing any maintenance work on the
Votator II, lock out and tag out equipment.
Shaft Removal - Horizontal Unit
1.
Check to make sure all supply lines to unit are closed, locked
out and tagged out.
2.
Disconnect product piping and seal flush lines.
3.
Rotate head in OFF direction until you feel head disengage.
4.
Pull head and shaft assembly out approximately one (1) inch.
5.
Remove hinged clamp that holds shaft nut guard in place.
See Figure 26.
6.
Remove shaft locknut. (Locknut is left hand threaded). See
Figure 27.
7.
Insert HRT as shown in Figure 28 and slide the head and
bearing off the shaft to protect the stationary seal face during
disassembly.
Figure 28 - Use of Head Removal Tool (HRT)
HE100-119
HRT
Mutator Shaft
8.
Lift shaft so that shaft removal skid can be inserted between
shaft and tube.
NOTE:
NEVER remove mutator shaft without using shaft removal
skid. Failure to do so will result in permanent damage to heat
transfer tube.
9.
Slide shaft removal skid into tube.
10. Pull shaft and shaft removal skid from tube as a unit. This will
ensure that tube will not be scored when shaft is removed.
Figure 26 - Removal of Hinged Clamp
Figure 27 - Removal of Shaft Locknut
Figure 29 - Shaft Removal
Figure 30 - Removal of Shaft Drive
End
Small end of tool
engages shaft thread
(shown out of position)