introduction

These instructions are intended to assure that field connections are completed 
properly and the control system operates for the maximum time possible. Since 
product warranty may depend on your actions, please read these instructions 
thoroughly prior to operation.
If you have questions about the operation and/or maintenance of this control 
system and you do not find the answers in this manual, please contact your 
Marley sales representative.

Hazard of electrical shock or burn. Be sure to turn off power to the 
panel before servicing. If working on equipment out of site of panel 
disconnect, lockout using standard lockout procedure.

Safety First

The Marley control system uses UL listed components installed in accordance 
with the National Electric Code. The location of the cooling tower and field 
installation of the control system can affect the safety of those responsible 
for installing, operating or maintaining the tower and controls. However, 
since SPX Cooling Technologies does not control the tower location, or field 
installation, we cannot be responsible for addressing safety issues that are 
affected by these items.

The following safety issues should be addressed by those responsible 
for installation, maintenance or repair of the tower and controls:
 

•  Access to and from the control panel (including the customer supplied 

main disconnect/branch circuit protection.)

 

•  Proper grounding of electrical control circuits.

 

•  Sizing and protection of branch circuits feeding the control panel.

 

•  Qualification of persons who will install, maintain and service the electri-

cal equipment.

These are only some of the safety issues that may arise in the design and 
installation process. Marley strongly recommends that you consult a safety 
engineer to be sure that all safety considerations have been addressed.
Other safety issues are addressed in literature supplied with your tower. You 
should closely review the literature prior to installing, maintaining or repairing 
your tower.

 

Warning

 

Warning

Summary of Contents for MARLEY LLC+ui

Page 1: ...LLC ui integrated ultrasonic water level control INSTALLATION OPERATION MAINTENANCE Z1080552 ISSUED 11 2018 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT user manual...

Page 2: ...n and follow all instructions Save this manual for future reference Note Indicates presence of a hazard which can cause severe personal injury death or substantial property damage if ignored Indicates...

Page 3: ...installing operating or maintaining the tower and controls However since SPX Cooling Technologies does not control the tower location or field installation we cannot be responsible for addressing saf...

Page 4: ...mp Pump BMS Stilling Chamber Basin Floor 6amp 120 1 60 Utility Supply Junction Box Extension if required Marley Control Panel e g AIO SPPC Display SYSTEM DIAGRAM LLC ui Components Optional Field Compo...

Page 5: ...rogrammed levels Requires field programming 1 Measure and program the distance between sensor and water basin floor 2 Program the water level setpoints 3 Operate WATER MAKE UP selector switch to opera...

Page 6: ...ition Measure the distance from the bottom of the ultrasonic sensor to the basin floor Access the program by pressing GOTO SETUP Press the light blue screen cell under ENTER PASSWORD bringing up a yel...

Page 7: ...l programming screens On each screen enter the water level setpoint values by pressing the light blue cell and entering a value on the yellow keypad then press ENT to save Recommendedlevelsareuniquefo...

Page 8: ...rcuitry for water makeup in the LLC ui control panel provides an inde pendent circuit breaker for direct connection to a 110 120VAC water solenoid valve Thisaddedfeatureallowscustomerinstallationwitho...

Page 9: ...a metal to metal connection The sensor wire is a four wire plus shielded cord The red and black wires connect to terminal points 24 and 13 The shield connects to ground Always refer to the as built wi...

Page 10: ...SIN WATER MAKEUP ON DRY CONTACT BASIN WATER MAKEUP ON DRY CONTACT BASIN WATER HIGH LEVEL ALARM DY CONTACT BASIN WATER HIGH LEVEL ALARM DY CONTACT BASIN WATER HIGH LEVEL CUTOFF DRY CONTACT BASIN WATER...

Page 11: ......

Page 12: ...the interest of technological progress all products are subject to design and or material change without notice LLC ui water level control US E R MAN UAL SPX COOLING TECHNOLOGIES INC 7401 WEST 129 STR...

Reviews: