Z03
L09
J02R/L
Z02
T08
1
2
3
4
1 1
1
1
2
4
1 1
1 1
4
4
3
3
36
J06
Install the L09 gutter profile over the edges of the panels,
ensuring the rubber strip seals against the panels.
Then fix into place with the Z03 screws, do not over tighten.
When installing the J06 and the second section of gutter,
it can help if you have 2 people, one guiding the gutter
into the J06 and the other gently tapping the end of the
gutter with a rubber mallet. It can help to install the J06
into one end of the gutter before hand.
T08
J 07
T08
Z02
J 08
To avoid leaking, using silicone
on J02R / L, T08 and J07
is an option (see Fig. above).
Drill one hole on both L01A & D
approx 500mm up from the bottom,
Dia. 2.5mm, then tighten J08 with
Z02, and push T08 into the channel
of J08 (see Fig. above).