![Sproutwell GRANGE-3,3000 Assembly Instructions Manual Download Page 25](http://html1.mh-extra.com/html/sproutwell/grange-3-3000/grange-3-3000_assembly-instructions-manual_1352000025.webp)
25
QTY.
NO.
PART
L15A
2
2
L15A
4
Z02
4
S02
8
Z04
W08
2
W08A
2
12
M01
Roof Vent
Roof Vent
Roof Vent
Ø
4X16D
Ø
4X10D
M6X20
M6
S05
M5X35
M05
M5
8
8
M06
M5
8
L15A
S02/M01
L06
L06
L15A
L15A
L15A
Z02
Z02
1
2
3
Z04
L21
W06
W08
L04E
Z04
L21
W06
W08A
L04E
4
3
5
Z04
S01/M01
L04E
L21
Use the nut M06 to secure the long screw S05 through the holes of
*The wingnut M05 must be secured once the vent arm W06 is locked
S05
M06
M05
W08/W08A
each W08 & W08A.
in place in windy days.
Note: If you have a greenhouse with an extension kit, the W08/W08A
will have pre-riveted pins. It is ideal to use the wingnut fittings
on the windy elevation of the greenhouse.
S05/M06
S05/M06