33
Trhbrt
STEP 13
y
t
Q
#
e
r
a
w
d
r
a
H
y
t
Q
#
tr
a
P
AB29
2 pcs
U572S
1 pc
AB52
1 pc
U572B
1 pc
s
c
p
8
6
S
c
p
1
3
5
B
A
Guide AB29 through the edges of U572B. Lay the canopy over the top of the playhouse, then attach
AB29 to AB28, using S6 (4 pcs).
Guide AB52 and AB53 through U572S and attach to AB50, AB1 and AB6, using S6 (4 pcs) as
shown below.
U572B
U572S
U572S
AB53
AB28
AB50
AB50
AB6
AB1
AB28
AB31
AB29
AB29
S6
S6
S6
S6
S6
S6
S6
S6
U572S
AB52
AB53
U572B
AB29
AB29
ASSEMBLY AND INSTALLATION INSTRUCTIONS
AB52