
PAGE 11 OF 16
DESCRIPTION
6VKYY
SAUCER SWING
ASSEMBLY
INSTRUCTION
20/F, Parkview Centre, 7 Lau Li Street, Causeway Bay, Hong Kong.
After Service Centre (+44) 01702 208182
3
3
4
4
5
3
3
4
4
5
Note:
-Plastic cap (11) needs to be inserted into rail (5) before securing the bolt.
-Cross rail (5) needs to be attached to the outer sides of the swing frame.
5
3
4
G
F I
H
F
x 4pcs
I
x 4pcs
H
x 4pcs
A
x 4pcs
11
x 4pcs
G
x 4pcs
11
A
step 5