
14
STEP 4
There are a total of 72 springs. For even distribution of spring tension and ease of
assembly, the springs must always be installed on opposite sides of the mat in an alternating manner, i.e. 1,
then 37, followed by 19 and 55 as shown in below FIGURE. For ease of calculating springs, place the first spring
beside a leg joint and in front of the warning label.
Hint: The number of triangle-rings sewn onto the Mat is equal to the number of holes on the frame. If you
notice that you have miscounted a hole or triangle-ring, remove and reinstall the springs as necessary while
maintaining an even distribution of tension as explained above.
\
Heavy gloves must be used to protect your hands from pinch points during assembly and goggles
must be worn to avoid injuries to the eyes.
4
1
#13
#15
# 15
# 13
1
19
55
37
1
Summary of Contents for 12FT
Page 19: ...15 STEP 5 4 1 13 15 15 13 1 10 28 46 64 19 55 37 1...
Page 20: ...16 STEP 6 1 10 14 23 5 28 32 41 50 59 68 46 64 19 55 37 1 4 1 13 15 15 13...
Page 22: ...18 STEP 8 4 14 4 14...
Page 23: ...19 STEP 9 2 2 2...
Page 24: ...20 STEP 10 K 10 12 6B 6B 6B B B B B B B...
Page 26: ...22 STEP 12 L C1 L C1 E 16 L A...
Page 27: ...23 STEP 13 18 E 16...
Page 28: ...24 STEP 14 F F...
Page 30: ...26 HOW TO FOLD EASI STORE ENCLOSURE K 12 10 K...
Page 31: ...27...
Page 32: ...28...