NOTE: Slide should be installed in shaded areas or face NORTH to

projections that may have been caused by rough handling in 

equipment.*

USE AREA & FOOTING LAYOUT

USE AREA & FOOTING LAYOUT

USE AREA & FOOTING LAYOUT

USE AREA & FOOTING LAYOUT

GENERAL MAINTENANCE INSTRUCTIONS:

GENERAL MAINTENANCE INSTRUCTIONS:

GENERAL MAINTENANCE INSTRUCTIONS:

GENERAL MAINTENANCE INSTRUCTIONS:

should be put in concrete to maintain proper finish grade for 

and/or replace immediately.

GENERAL ASSEMBLY INSTRUCTIONS:

GENERAL ASSEMBLY INSTRUCTIONS:

GENERAL ASSEMBLY INSTRUCTIONS:

GENERAL ASSEMBLY INSTRUCTIONS:

Check MONTHLY for loose bolts, damaged or broken parts. Tighten

* If Resilient Surfacing is to be less than 12", then additional pipe

instructions. Go over entire unit to file smooth any sharp edges or 

many situations only one bolt is required. See specific assembly

T-Clamps are designed for both one and two bolt connections. In

AND/OR PEENED OVER TO REMOVE ANY SHARP EDGES. 

BOLTS PROTRUDING BEYOND NUTS SHOULD BE CUT OFF

plumbed & leveled. After assembly is complete, ANY ENDS OF 

should be done EVENLY after final assembly when unit has been

Only hand tighten nuts & bolts on initial assembly. Final tightening

degrees off level to facilitate water drainage.

ASSEMBLY & INSTALLATION:

ASSEMBLY & INSTALLATION:

ASSEMBLY & INSTALLATION:

ASSEMBLY & INSTALLATION:

shipping or installation. On products with platforms install 1 -2

Mark & dig footing holes per diagram.

1.

Assemble entire slide lying unit on its side on the ground. Start

2.

by attaching Ladder to Platform. See Detail A.

Attach Platform Guard Rail to Platform Legs. See Detail B. 

3.

Then attach Guard RAil Assy. To Platform. See Detail C.

Attach Slide Bedway to Platform. See Detail D.

4.

Attach Leg Holder to Slide Bedway. See Detail E. Then Attach

5.

Slide Leg to Bedway. See Detail F.

Attach Ladder Hand Rail to Guard Rail & Ladder. See Detail G.

6.

Attach Entrance Bar to GuardRails. See Detail H.

7.

Raise & brace unit in footing holes. Leength of legs below 

8.

intended level of Resilient Surfacing should be 24"

Plumb & Level. Tighten all nuts & bolts so that lock washers 

9.

are flat. Pour Concrete. Wait 48 hrs before removing brace,
installing Resilient Surfacing & using equipment.

Attach Warning Label and Manufacturers Identification Label to

10.

a clean surface. The Labels should be attached in a locations
where they are clearly visible and legible and away from 
normal hand and foot placement areas. The Labels must be 
replaced if they become if they become illegible, destroyed,
or removed. Contact your distributor for replacement Labels.

SUPER SLIDE 4'

SUPER SLIDE 4'

SUPER SLIDE 4'

SUPER SLIDE 4'

5

4

3

2

1

421-408

421-408

421-408

421-408

Indicates

Dashed Line

Use Zone

Concrete Footing
1' 

 x 2' Deep

(7 Places)