July 20, 2012
7
602-760I 8’ Single Covered Bench w/ Back Inground Mount
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__5)
Continued:
inside of the top while the sleeves that go over
the legs are facing up, then you will line up the bolt holes in the end
of the frames to the holes in the top and bolt them together (See
Detail B). Once the frame and top are bolted together then you will
attach the top to the legs using the 3/8” x 4
¼
” Hex Bolt SS (5),
3/8” Flat Washers (8), and the 3/8” Nylon Insert Lock Nuts (7)
__6)
Set structure in footing holes:
With the entire structure
assembled and your footing holes dug, you will stand the entire
structure up inside of your footing holes. When you have the
structure inside the footing holes you will then level the main post,
when the post are leveled place and kind of blocking material
underneath arms coming off of the main post to hold it in place.
With everything leveled and sturdy you can then pour your
concrete into your footing holes. Allow sufficient time for concrete
to set before using covered benches.
__7)
Once the concrete has set
, back fill dirt over the footing
holes; inspect the area and components for tools, hazardous debris
and sharp edges. Verify all components are installed and all
hardware is tight and then install the safety surfacing.
__8)
Inspect the components:
for sharp edges and if necessary
file them down and apply touch up paint.