background image

  
 

July 20, 2012 

 

                                                                                  602-760I 8’ Single Covered Bench w/ Back Inground Mount 
                                                                                                                             INSTALLATION INSTRUCTION 

INSTALLATION STEPS CONTINUED 

__5)  

Continued:

 inside of the top while the sleeves that go over 

the legs are facing up, then you will line up the bolt holes in the end 
of the frames to the holes in the top and bolt them together (See 
Detail B). Once the frame and top are bolted together then you will 
attach the top to the legs using the 3/8” x 4 

¼

” Hex Bolt SS (5), 

3/8” Flat Washers (8), and the 3/8” Nylon Insert Lock Nuts (7)  
__6)

 Set structure in footing holes: 

With the entire structure 

assembled and your footing holes dug, you will stand the entire 
structure up inside of your footing holes. When you have the 
structure inside the footing holes you will then level the main post, 
when the post are leveled place and kind of blocking material 
underneath arms coming off of the main post to hold it in place. 
With everything leveled and sturdy you can then pour your 
concrete into your footing holes. Allow sufficient time for concrete 
to set before using covered benches. 
__7) 

Once the concrete has set

, back fill dirt over the footing 

holes; inspect the area and components for tools, hazardous debris 
and sharp edges.  Verify all components are installed and all 
hardware is tight and then install the safety surfacing. 
__8)  

Inspect the components:

 for sharp edges and if necessary 

file them down and apply touch up paint. 
 
 
 
 

 

 

 

Summary of Contents for 602-760I

Page 1: ...allation time 1 5 3 man hrs Weight 338 MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently A maintenance section that includes component specific maintenance requirements is included at the end of this manual ...

Page 2: ...ered Bench Single Side Inground Mt 2 3 613 520 Top for Single Sided 8 Covered Bench 1 4 613 524 Frame for 8 Single Cover Top 1 5 116 618 3 8 x 4 Hex Bolt SS 2 6 126 701BPS 3 8 x 1 Button Pin SS 20 7 226 602 3 8 Nylon Insert Lock Nut 2 8 316 601 3 8 Flat Washer 24 9 416 505BPK 7 32 Long Arm Button Pin Key 2 NOTE Keep a copy of these instructions on file to assist you with maintenance and replacemen...

Page 3: ...ial to prevent it from sinking further into the soil We recommend you use a brick block of wood or several inches of gravel The footing depth does not include this blocking material since materials used often vary It is the owner installers responsibility to check local building codes and to comply with those codes All footing depths listed here are recommendations and local soil types and frost l...

Page 4: ...July 20 2012 4 602 760I 8 Single Covered Bench w Back Inground Mount INSTALLATION INSTRUCTION ...

Page 5: ...cult to use particularly if you need to take them out to make an adjustment It is recommended that you add a drop of oil to bolts that may have to be removed before you install them Do not tighten bolts all the way until the unit is completely assembled and all components are square and level Identify and separate all parts by referencing the detail drawings and the parts list As you unpack and se...

Page 6: ...booklet to see how far apart to dig your footing holes __5 Assembly After you have dug your footing holes the next step is to assemble the Covered bench To assemble you will need all parts listed in this instruction booklet First you will bolt your 8 Beveled Edge Perf Benches 1 to the Cantilever Leg for Covered Bench 3 using the 3 8 x 1 Button Pin SS Bolts 6 3 8 Flat Washers 8 and the 3 8 Nylon In...

Page 7: ...oles dug you will stand the entire structure up inside of your footing holes When you have the structure inside the footing holes you will then level the main post when the post are leveled place and kind of blocking material underneath arms coming off of the main post to hold it in place With everything leveled and sturdy you can then pour your concrete into your footing holes Allow sufficient ti...

Page 8: ...July 20 2012 8 BLANK PAGE 602 760I 8 Single Covered Bench w Back Inground Mount INSTALLATION INSTRUCTION ...

Reviews: