background image

511-109 Challenge Ladder 

Page 

3 of 3

 

Rev 04/04/03 

SportsPlay Equipment, Inc

., 5642 Natural Bridge, St. Louis, MO 63120 (314) 389-4140 

GENERAL ASSEMBLY INSTRUCTIONS: 

 
Check all the parts and hardware with the packing list to be sure you have received 
everything needed to assemble this product.  CONTACT YOUR LOCAL DISTRIBUTOR WITH 
NOTIFICATION OF ANY MISSING OR DAMAGED PARTS.  Contact must be made within ten days of 
receipt of your order. 
Only hand-tighten nuts & bolts on initial assembly.  Final tightening should be done 
EVENLY after final assembly when unit has been plumbed & leveled.   
After assembly is complete, ANY ENDS OF BOLTS PROTRUDING BEYOND NUTS SHOULD BE CUT OFF 
AND/OR PEENED OVER TO REMOVE ANY SHARP EDGES.  Go over entire unit to file smooth any 
sharp edges or projections that may have been caused by rough handling in shipping or 
installation.  T-Clamps are designed for both one and two bolt connections.  In many 
situations only one bolt is required.  See specific assembly instructions. 
On products with platforms install 1 – 2 degrees off level to facilitate water drainage.  
 

GENERAL MAINTENANCE INSTRUCTIONS: 

 
Check MONTHLY for loose bolts, damaged or broken parts.  Tighten and/or replace 
immediately.    
 

SPECIFIC ASSEMBLY INSTRUCTIONS: 

 
NOTE: 

All threaded ends of bolts protruding beyond nuts must be cut off and/or 
peened to eliminate sharp edges.  No more than two threads should extend 
beyond face of nut. 
All washers, “T” nuts, and other fastener hardware used on round pipe or 
tubing must be hammered down to conform to the curved underlying surface to 
eliminate catch points.   

STEP #1: 

Mark & dig footing holes per SKETCH on PAGE #2. 

STEP #2: 

Assemble unit on the ground. 
 
 
 
 
 
 
 
 
 
 
 
 
 

STEP #3: 

Stand upright & brace in footing holes.  Attach braces to legs to hold 
proper height.  Length of pipe below intended level of resilient surfacing 
should be approximately 24”.  Two long braces holding 2 legs each are 
recommended. 

STEP #4:

 

Plumb & level.  Tighten all screws using a short length of pipe with socket 
key for added leverage.  Pour concrete.  Let stand 48 hours before removing 
braces, installing resilient surfacing and using equipment. 

STEP #5: 

Attach Warning Label and Manufacturer’s Identification Label to a clean 
surface.  The labels should be attached in a location where they are clearly 
visible and legibl3e and away from normal hand and foot placement areas.  
The labels must be replaced if they become illegible, destroyed or removed.  
Contact your distributor for replacement labels. 

 
 

Reviews: