SportsPlay 301-146 10' MGR Installation Instructions Manual Download Page 1

  
 

October 4, 2010  

 

 

301-146 10’ MGR 

INSTALLATION INSTRUCTION 

 

 

INSTALLATION DETAILS 

!

 

Recommended crew (Adult)

: 2-3

 

!

 

Installation time

: 8-12 Hours not including 

concrete cure time

 

!

 

User age

: 5-12

 

!

 

Use zone

: 22’ Diameter 

!

 

Weight

: 990 

!

 

Actual Dimension

: 120” Diameter 

 

WARNING

 

 Use of safety surfacing (wood mulch) in 

compliance with ASTM specification 

F1292 is required.  

MAINTENANCE: 

!

 

As the owner of the playground you are 
responsible for maintenance of the equipment and 
play area.  A maintenance schedule must be 
developed and the equipment inspected frequently.  
Periodic Inspections, maintenance, repair and 
replacement of damaged parts is necessary for the 
safe operation and use of the equipment  

!

 

A maintenance section that includes component 
specific maintenance requirements is included at 
the end of this document. 

 

UNIT IS DESIGNED FOR 12” OF LOOSE RESILIENT 
SURFACING.  WOOD MULCH IS THE MANUFACTURERS 
PREFERED MATERIAL. 
THIS UNIT WILL NOT INSTALL ON POUR IN PLAY.  UNIT 
WILL ALSO NOT INSTALL OVER ANY OTHER 
SURFACING THAT IS LESS THAN 12” HIGH 

 

Summary of Contents for 301-146 10' MGR

Page 1: ... for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently Periodic Inspections maintenance repair and replacement of damaged parts is necessary for the safe operation and use of the equipment A maintenance section that includes component specific maintenance requirements is included at the end of this document UNIT IS DESIGNED F...

Page 2: ... 4 336 046 Center Hub Disk for 10 MGR 1 5 913 377 10 MGR Hub Assembly 1 6 913 378 10 MGR Support Arm 6 7 336 044 1 1 2 Ball Bearing 1 8 336 030 Grease Fitting 2 9 316 801Z 1 2 Flat Washer Zinc 6 10 226 802Z 1 2 Nylon Lock Nut Zinc 6 11 126 810 1 2 x 4 Carriage Bolt 6 12 126 701bps 3 8 x 1 1 4 Button Head Bolt 107 13 316 601 3 8 Flat Washer 214 14 226 602 3 8 Nylon Lock Nut 107 15 416 505bpk 7 32 S...

Page 3: ...October 4 2010 3 301 146 10 MGR INSTALLATION INSTRUCTION ...

Page 4: ...into the footing hole See drawing on next page for footing surfacing side view It is the owner installers responsibility to check local building codes and to comply with those codes All footing depths listed here are recommendations and local soil types and frost lines may require a deeper and or wider footing depth If that s the case you must add more blocking material to accommodate the deeper f...

Page 5: ...October 4 2010 5 301 146 10 MGR INSTALLATION INSTRUCTION ...

Page 6: ...mage by getting caught inside the mgr post like sand or gravel is likely to do Do not completely tighten bolts until told to do so When instructed tighten deck bolts incrementaly as you move around the MGR to prevent gaps in between the deck sections Stainless Steel hardware can occasionally be difficult to use particularly if you need to take them out to make an adjustment It is recommended that ...

Page 7: ...ions before adding concrete for safety and durability of product __3 Add concrete to hole leave 2 of space in the hole below the surface grade for backfill Crown the top of the concrete down and away from the post to help prevent water build up around the post Periodically check the post to ensure it is level while concrete is curing Wait a minimum of 48 hours before continuing installation __4 Af...

Page 8: ...e Hub Disk 4 to the deck sections 1 and the Hub Assembly 5 by placing hub disk on top of the decks over the hub assembly and attach by inserting the 4 carriage bolts down through the decks and hub assembly Secure from the bottom of the hub assembly with 1 2 washers and 1 2 lock nut see Detail E __8 Attach the Handrails 2 to the Deck Sections 1 using 1 1 4 bolts two 3 8 washers and a 3 8 lock nut N...

Page 9: ...and once the primer has dried paint with color matching touch up paint Contact distributor of color matching paint Contact Distributor for Thermoplastic repair kit Governor Inspect Governor weekly when greasing unit Ensure that all pieces are installed and secure Ensure rubber wheel is in contact with the sleeve If not tighten by first backing off jam nut tighten adjustment bolt until wheel is in ...

Page 10: ... ACTIONS ON THE LIST AS WELL AS ANY NOT LISTED INCLUDE DATES AND SIGNATURES Inspection Checklist Recommended Frequency Grade Pass Fail NA Date Inspected Date Repairs Completed Inspect Governor Weekly Inspect Hardware Weekly Grease Shaft Weekly Inspect Finish Monthly Inspect Footing Yearly Inspect Surfacing Daily Inspector _______________________ Signature ___________________________________ Date _...

Reviews: