background image

561-443 Heavy Duty Football Goal - Pair

 

Page 2 of 2 

Rev. 05/21/08

 

ASSEMBLY AND INSTALLATION: 

 
 

NOTE: 

All threaded ends of bolts protruding beyond nuts must be 

cut off and/or peened to eliminate sharp edges.  No more 

than two threads should extend beyond face of nut. 

All washers, “T” nuts, and other fastener hardware used on 

round pipe or tubing must be hammered down to conform to the 

curved underlying surface to eliminate catch points. 

 

DO NOT tighten nuts more than hand-tight until entire 

assembly is completed. 

 

STEP #1: 

Mark and dig footing holes 

 

STEP #2: 

Assemble Goal posts 

 

STEP #3: 

Pour footings using: 

 

60 – 80lb. Bags Pre-Mix Cement – 15 bags per hole. 

 

Place bricks or old cement chunks below the posts to allow 

wet cement under the post.  Be sure to maintain the height 

and distance between posts, per diagram on page 1, for each 

goal post. 

 

Be sure to ‘cone’ the top of the pour for drainage. 

 

STEP #4:

 

Plumb and level posts. 

 

STEP #5: 

Brace posts until cement is dry. 

 

NOTES:

 

Wait 48 hours for concrete to harden before using unit. 

 

DO NOT install where overhead electrical wires are present. 

  

 

 

MAINTENANCE INSTRUCTIONS: 

 

Check periodically for loose bolts, broken parts and replace 

immediately. 

 

 

SportsPlay Equipment, Inc., 5642 Natural Bridge, St. Louis, MO 63120  (314) 389-4140 

 

Reviews: