1-2. Use hardware (61,62,63,64,92,93) to secure the main frame (5) to the seat frame
(29).
1-3. Use hardware (62,63,64,73) to secure the seat frame (29) to the mast (21).
1-4. Thread the cable through the main frame (5). Attach the horizontal beam (22) to the
main frame (5) and the mast (21) as shown.
1-5. Use hardware (62,63,64) to loosely secure the horizontal beam (22) to the main
frame (5) and the mast (21).
-9-
Summary of Contents for DF-103
Page 1: ......
Page 4: ...2 2 1 DIMENSIONS CHAPTER 2 INSTRUCTIONS...
Page 9: ...7 CHAPTER 3 ASSEMBLY INSTRUCTIONS STEP 1 Connector Installation...
Page 13: ...Weight Plate Installation STEP 2 11...
Page 15: ...13 2 2 Remove hardware 67 68 69 Guide the guide rods 70 downward as shown...
Page 19: ...17 2 7 Tilt the guide rods 70 back into place...
Page 21: ...STEP 3 19 Weight Stack Sticker Application...
Page 23: ...STEP 4 21 Cable Installation 4 1 Secure the cable to the upper stack carriage as shown...
Page 25: ...STEP 6 23 Press Yoke Installation...
Page 29: ...27...
Page 30: ...STEP 8 28 Lat Pull Bar and Bracket Installation...
Page 45: ...43 Chest Press Mid Row...