4-4. Install the cable on the left side.
(a) Cut the zip tie at position B on the cable. Note: Do not cut the inner zip tie.
(b) Insert the cable as indicated, first feeding the cable through pulley C (71),
then secure hardware (62,63,64,66). Then insert the cable through pulley B (69).
Secure this pulley with hardware (62,63,66,68). Continue threading the cable as
indicated, employing the floating pulley (23) as shown. Finally, secure the cable
to the upper stack carriage as shown. (Note: secure covers so they are parallel
to but not touching the cable.)
-19-
Summary of Contents for DF-102
Page 3: ...2 2 1 DIMENSIONS CHAPTER 2 INSTRUCTIONS...
Page 9: ...Weight Plate Installation STEP 2 8...
Page 11: ...10 2 2 Remove hardware 56 57 58 Guide the guide rods 59 downward as shown...
Page 14: ...13 2 6 Tilt the guide rods 59 back into place...
Page 16: ...Weight Stack Sticker Application STEP 3 15...
Page 18: ...STEP 4 17 Install the Cable...
Page 23: ...4 7 Finally cut the zip tie at inner position D 22...
Page 24: ...4 8 Cut the zip tie after assembly Pull Handle A to the proper position 23...
Page 25: ...4 9 Cable Route Illustration 24...
Page 32: ...8 3 Hang back cover A 3 onto screws 79 Simultaneously hook back cover A 3 into rear cover 4 31...